Jump to: navigation, search

Difference between revisions of "Meetings/InfraTeamMeeting"

(Agenda for next meeting)
(Agenda for next meeting)
 
(282 intermediate revisions by 13 users not shown)
Line 12: Line 12:
  
 
* Actions from last meeting
 
* Actions from last meeting
 +
 +
* Specs Review
  
 
* Topics
 
* Topics
** Mailman Ansible and Server Upgrades (clarkb 20210914)
+
** Upgrading Old Servers (clarkb 20230627)
*** lists.openstack.org is running focal now
+
*** https://etherpad.opendev.org/p/opendev-bionic-server-upgrades
**** Number of manual edits made to services captured in https://review.opendev.org/c/opendev/system-config/+/808570
+
*** https://etherpad.opendev.org/p/opendev-focal-server-upgrades
**** Ran into issues with Xen being able to boot lz4 compressed kernels
+
*** https://review.opendev.org/q/topic:jitsi_meet-jammy-update
**** We decompressed the kernel but that still failed
+
*** Started looking at the wiki there are rough notes at: https://etherpad.opendev.org/p/opendev-bionic-server-upgrades#L58
**** We installed grub-xen then set up a chainload situation to a xen specific grub preloader via /boot/grub/menu.lst
+
** MariaDB Upgrades (clarkb 20240220)
**** This chainload situation may not need a compressed kernel? If it doesn't this server may be viable long term and we can document things.
+
*** Relying on the container image MARIADB_AUTO_UPGRADE flag
**** We should consider replacing the server to get away from Xen PV weirdness and to maybe use a floating IP which can be moved between upgraded instances in the future.
+
*** Everything but Gerrit is done now. When do we think we want to do Gerrit?
** Improving OpenDev's CD throughput (clarkb 20210914)
+
** AFS Mirror cleanups (clarkb 20240220)
*** We can run many of our jobs in parallel in all of our CD pipelines. But this requires we properly document/address dependencies
+
*** Ubuntu Xenial cleanups are starting to show up under topic:drop-ubuntu-xenial
**** Need to understand our job dependencies and properly note them in Zuul config or address them by combining jobs.
+
*** Can followup with webserver log processing to determine which other mirrors may be dead.
***** Example 1: Combine service-gitea-lb and service-gitea jobs.
+
** Building Ubuntu Noble Nodes (clarkb 20240416)
***** Example 2: Combine letsencrypt and nameserver jobs
+
*** Next step is to add Noble to our mirrors
***** Example 3: Have all jobs with webserver config express a dependency on the letsencrypt job
+
** Gerrit 3.9 Upgrade Planning (clarkb 20240423)
**** Suggest we document the known job dependencies in a human readable format, then encode this into zuul, then we can switch to parallel runs.
+
*** Upgrade prep notes are going in https://etherpad.opendev.org/p/gerrit-upgrade-3.9
**** https://review.opendev.org/c/opendev/system-config/+/807672/ starts to sketch this out.
+
*** https://www.gerritcodereview.com/3.9.html Release Notes
** Gerrit Account cleanups (clarkb 20210914)
+
*** https://review.opendev.org/c/opendev/system-config/+/918333 Need updated and promoted 3.9 image before doing more testing.
*** 33 conflicts remain. Clarkb has written notes on proposed plans for each user in the comments of review02:~clarkb/gerrit_user_cleanups/audit-results-annotated.yaml
+
*** Downgrade is possible with an offline reindex using the old war.
** OpenDev logo hosting (clarkb 20210914)
+
*** Things to think about:
*** Next up would be updating paste and gerrit. Then we can safely upgrade the gitea server without impacting theming on other services.
+
**** Do we want to enable diff3 diffs on merge changes?
** Working with InMotion Friday to increase IP addr allocation and scale up (clarkb 20210914)
+
**** Change topic limit seems to only apply to open changes. Being over the limit doesn't seem to impact the upgrade process
*** Will try to debug instance launch failures there prior to Friday.
+
**** https://gerrit-review.googlesource.com/c/gerrit/+/424404 Upstream change to have release war build target without webfonts
 +
**** There is a new batched ref updated event that collects multiple ref updated events in a single event. This is disabled by default, but could one day impact zuul. Work sorting out likely.
 +
*** Server could stand to be upgraded as well but I think it is probably best to decouple these concerns.
 +
** Wiki SSL Cert Renewal (clarkb 20240423)
 +
*** Clarkb will renew Friday ish (May 10)
  
 
* Open discussion
 
* Open discussion
Line 41: Line 47:
 
== Upcoming Project Renames ==
 
== Upcoming Project Renames ==
 
(any additions should mention original->new full names and link to the corresponding project-config rename change in Gerrit)
 
(any additions should mention original->new full names and link to the corresponding project-config rename change in Gerrit)
 +
Changes should have their topic set to project-rename.
  
* foo/example -> bar/example: https://review.opendev.org/#/c/123456
+
* Rename example/foo -> example/bar: https://review.opendev.org/c/openstack/project-config/+/123456
* Venus project (below repos) moving from inspur to openstack namespace: https://review.opendev.org/c/openstack/project-config/+/808149
 
** inspur/python-venusclient -> openstack/python-venusclient
 
** inspur/venus -> openstack/venus
 
** inspur/venus-specs -> openstack/venus-specs
 
** inspur/venus-tempest-plugin -> openstack/venus-tempest-plugin
 
** inspur/venus-dashboard -> openstack/venus-dashboard
 
  
 
== Previous meetings ==
 
== Previous meetings ==
 
Previous meetings, with their notes and logs, can be found at http://eavesdrop.openstack.org/meetings/infra/ and earlier at http://eavesdrop.openstack.org/meetings/ci/
 
Previous meetings, with their notes and logs, can be found at http://eavesdrop.openstack.org/meetings/infra/ and earlier at http://eavesdrop.openstack.org/meetings/ci/

Latest revision as of 21:25, 6 May 2024

Weekly Project Infrastructure team meeting

The OpenDev Team holds public weekly meetings in #opendev-meeting on OFTC, Tuesdays at 1900 UTC. Everyone interested in infrastructure and process surrounding automated testing and deployment is encouraged to attend.

Please feel free to add agenda items (and your IRC nick in parenthesis).

Agenda for next meeting

  • Announcements
  • Actions from last meeting
  • Specs Review
  • Open discussion

Upcoming Project Renames

(any additions should mention original->new full names and link to the corresponding project-config rename change in Gerrit) Changes should have their topic set to project-rename.

Previous meetings

Previous meetings, with their notes and logs, can be found at http://eavesdrop.openstack.org/meetings/infra/ and earlier at http://eavesdrop.openstack.org/meetings/ci/