Jump to: navigation, search

Difference between revisions of "Meetings/InfraTeamMeeting"

(Agenda for next meeting)
(Agenda for next meeting)
(300 intermediate revisions by 13 users not shown)
Line 13: Line 13:
 
* Actions from last meeting
 
* Actions from last meeting
  
* Specs approval
+
* Specs Review
  
 
* Topics
 
* Topics
** Gerrit Account cleanup (clarkb 20210706)
+
** Upgrading Bionic servers to Focal/Jammy (clarkb 20230627)
*** Clarkb going to retire the next large set of accounts today. External id cleanup to follow in a few weeks.
+
*** https://etherpad.opendev.org/p/opendev-bionic-server-upgrades
** review upgrade (ianw 20210706)
+
*** https://review.opendev.org/q/topic:jitsi_meet-jammy-update
*** Scheduled for July 18 at 23:00 UTC
+
*** Started looking at the wiki there are rough notes at: https://etherpad.opendev.org/p/opendev-bionic-server-upgrades#L58
*** upgrade checklist ready for review
+
** MariaDB Upgrades (clarkb 20240220)
*** https://etherpad.opendev.org/p/gerrit-upgrade-2021
+
*** Relying on the container image MARIADB_AUTO_UPGRADE flag
** Draft matrix spec (corvus 20210706)
+
*** Etherpad and mailman are done. Gerrit and Gitea are all that remain.
*** https://review.opendev.org/796156
+
** AFS Mirror cleanups (clarkb 20240220)
*** Discussion with EMS went well. They don't seem opposed to our idea.
+
*** Ubuntu Xenial is next but currently busy with PTG, Release, and other tasks.
*** Next step is to start a trial account. clarkb will coordinate this.
+
*** Can followup with webserver log processing to determine which other mirrors may be dead.
** Gitea01 backups to one of two servers are unhappy (clarkb 20210706)
+
** Building Ubuntu Noble Nodes (clarkb 20240416)
** Scheduling project renames (clarkb 20210706)
+
*** https://review.opendev.org/c/opendev/glean/+/915907 Glean updates for python3.12 support
*** We have penciled in the week after the server upgrade. Will decide on specific time later.
+
*** Appears we will need a debootstrap from debian unstable to build noble
*** Add your rename requests to the list now.
+
** Etherpad 2.0.x Upgrade planning (clarkb 20240416)
*** https://review.opendev.org/c/opendev/system-config/+/797990
+
*** https://review.opendev.org/c/opendev/system-config/+/914119
** Do we want to consider a new meeting time? (clarkb 20210706)
+
*** Etherpad 2.0.2 removes the old APIKEY API auth method and now uses Oauth2.0 client_credentials instead. This new system is not yet released, but we are working to determine how to use it pre release.
*** Current time is too late for frickler and very early for ianw.
+
** Add reference to the project-team-guide in the fail ci msg (fungi 20240423)
*** Happy to shift a little later to include ianw at a better time.
+
*** https://review.opendev.org/914189
 +
** Gerrit 3.9 Upgrade Planning (clarkb 20240423)
 +
*** https://www.gerritcodereview.com/3.9.html Release Notes
 +
*** Downgrade is possible with an offline reindex using the old war.
 +
*** Need to compile an upgrade checklist (go over breaking changes and also test the downgrade).
 +
*** Server could stand to be upgraded as well but I think it is probably best to decouple these concerns.
 +
** Wiki SSL Cert Renewal (clarkb 20240423)
 +
*** We have just under 4 weeks to renew the cert. This is one of the last (maybe the only) manually managed ssl cert.
 +
*** Will probably delay until we have less than a week left before processing it.
  
 
* Open discussion
 
* Open discussion
Line 39: Line 47:
 
== Upcoming Project Renames ==
 
== Upcoming Project Renames ==
 
(any additions should mention original->new full names and link to the corresponding project-config rename change in Gerrit)
 
(any additions should mention original->new full names and link to the corresponding project-config rename change in Gerrit)
 +
Changes should have their topic set to project-rename.
  
* (lajoskatona) x/tap-as-a-service -> openstack/tap-as-a-service: https://review.opendev.org/c/openstack/project-config/+/790093
+
* Rename example/foo -> example/bar: https://review.opendev.org/c/openstack/project-config/+/123456
* foo/example -> bar/example: https://review.opendev.org/#/c/123456
 
  
 
== Previous meetings ==
 
== Previous meetings ==
 
Previous meetings, with their notes and logs, can be found at http://eavesdrop.openstack.org/meetings/infra/ and earlier at http://eavesdrop.openstack.org/meetings/ci/
 
Previous meetings, with their notes and logs, can be found at http://eavesdrop.openstack.org/meetings/infra/ and earlier at http://eavesdrop.openstack.org/meetings/ci/

Revision as of 22:13, 22 April 2024

Weekly Project Infrastructure team meeting

The OpenDev Team holds public weekly meetings in #opendev-meeting on OFTC, Tuesdays at 1900 UTC. Everyone interested in infrastructure and process surrounding automated testing and deployment is encouraged to attend.

Please feel free to add agenda items (and your IRC nick in parenthesis).

Agenda for next meeting

  • Announcements
  • Actions from last meeting
  • Specs Review
  • Topics
    • Upgrading Bionic servers to Focal/Jammy (clarkb 20230627)
    • MariaDB Upgrades (clarkb 20240220)
      • Relying on the container image MARIADB_AUTO_UPGRADE flag
      • Etherpad and mailman are done. Gerrit and Gitea are all that remain.
    • AFS Mirror cleanups (clarkb 20240220)
      • Ubuntu Xenial is next but currently busy with PTG, Release, and other tasks.
      • Can followup with webserver log processing to determine which other mirrors may be dead.
    • Building Ubuntu Noble Nodes (clarkb 20240416)
    • Etherpad 2.0.x Upgrade planning (clarkb 20240416)
    • Add reference to the project-team-guide in the fail ci msg (fungi 20240423)
    • Gerrit 3.9 Upgrade Planning (clarkb 20240423)
      • https://www.gerritcodereview.com/3.9.html Release Notes
      • Downgrade is possible with an offline reindex using the old war.
      • Need to compile an upgrade checklist (go over breaking changes and also test the downgrade).
      • Server could stand to be upgraded as well but I think it is probably best to decouple these concerns.
    • Wiki SSL Cert Renewal (clarkb 20240423)
      • We have just under 4 weeks to renew the cert. This is one of the last (maybe the only) manually managed ssl cert.
      • Will probably delay until we have less than a week left before processing it.
  • Open discussion

Upcoming Project Renames

(any additions should mention original->new full names and link to the corresponding project-config rename change in Gerrit) Changes should have their topic set to project-rename.

Previous meetings

Previous meetings, with their notes and logs, can be found at http://eavesdrop.openstack.org/meetings/infra/ and earlier at http://eavesdrop.openstack.org/meetings/ci/