Jump to: navigation, search

Difference between revisions of "Meetings/InfraTeamMeeting"

(Agenda for next meeting)
(Agenda for next meeting)
(172 intermediate revisions by 10 users not shown)
Line 10: Line 10:
  
 
* Announcements
 
* Announcements
** PTG next week
+
** OpenInfra Summit CFP ends May 29, 2024
  
 
* Actions from last meeting
 
* Actions from last meeting
Line 17: Line 17:
  
 
* Topics
 
* Topics
** Bastion host (ianw 20221011)
+
** Upgrading Old Servers (clarkb 20230627)
*** Move ansible to a venv.
 
*** Replace bridge host once existing host is running ansible out of a venv
 
*** bastion host OS upgrade.  prioin-place?  new host?  wait until have time to return to some of the bootstrapping/parallel job work?
 
*** https://review.opendev.org/c/opendev/system-config/+/855472 Disable writing console log files on bridge and static
 
**** Needs a second change pushed to  opendev/base-jobs/playbooks/infra-prod/setup-keys.yaml
 
*** https://review.opendev.org/q/topic:bridge-ansible-venv
 
** Upgrading Bionic servers to Focal/Jammy (clarkb 20221011)
 
 
*** https://etherpad.opendev.org/p/opendev-bionic-server-upgrades
 
*** https://etherpad.opendev.org/p/opendev-bionic-server-upgrades
*** Need to retest launching a Jammy node now that user management is updated.
+
*** https://etherpad.opendev.org/p/opendev-focal-server-upgrades
** Mailman 3 (clarkb 20221011)
+
*** Started looking at the wiki there are rough notes at: https://etherpad.opendev.org/p/opendev-bionic-server-upgrades#L58
*** https://review.opendev.org/c/opendev/system-config/+/851248 Worthy of review at this point
+
*** Tonyb looking at cacti and the wiki as next items.
*** https://etherpad.opendev.org/p/mm3migration
+
** AFS Mirror cleanups (clarkb 20240220)
*** https://review.opendev.org/c/opendev/system-config/+/860157 Forking the upstream images due to lack of attention on issues and PRs we've filed
+
*** Ubuntu Xenial cleanups are starting to show up under topic:drop-ubuntu-xenial
** Switch base job nodeset to ubuntu-jammy (frickler 20221007)
+
*** Can followup with webserver log processing to determine which other mirrors may be dead.
*** Ubuntu 22.04.1 is out for some months now and thus can be considered stable, no need to wait a full year like we did with 20.04
+
** Building Ubuntu Noble Nodes (clarkb 20240416)
*** Patch to switch base-test job: https://review.opendev.org/c/opendev/base-jobs/+/860686/2
+
*** Mirrors for x86_64 and arm64 are in place. We should be able to add image builds to nodepool.
*** Plan for further steps? Timetable, which repos to test, announcements
+
** Gerrit 3.9 Upgrade Planning (clarkb 20240423)
*** Devstack currently inherits the base nodeset (via multinode) without pinning
+
*** Upgrade prep notes are going in https://etherpad.opendev.org/p/gerrit-upgrade-3.9
 +
*** https://www.gerritcodereview.com/3.9.html Release Notes
 +
*** Planning to upgrade the Gerrit server on May 31, 2024 from 1600-1700 UTC
 +
** Linaro Cloud SSL Cert Renewal (clarkb 20240521)
 +
*** It has been a couple of months and we need to renew the cert again. Should be documented now. Any volunteers?
  
 
* Open discussion
 
* Open discussion
Line 43: Line 40:
 
Changes should have their topic set to project-rename.
 
Changes should have their topic set to project-rename.
  
* Rename foo/example -> bar/example: https://review.opendev.org/123456
+
* Rename example/foo -> example/bar: https://review.opendev.org/c/openstack/project-config/+/123456
  
 
== Previous meetings ==
 
== Previous meetings ==
 
Previous meetings, with their notes and logs, can be found at http://eavesdrop.openstack.org/meetings/infra/ and earlier at http://eavesdrop.openstack.org/meetings/ci/
 
Previous meetings, with their notes and logs, can be found at http://eavesdrop.openstack.org/meetings/infra/ and earlier at http://eavesdrop.openstack.org/meetings/ci/

Revision as of 16:11, 21 May 2024

Weekly Project Infrastructure team meeting

The OpenDev Team holds public weekly meetings in #opendev-meeting on OFTC, Tuesdays at 1900 UTC. Everyone interested in infrastructure and process surrounding automated testing and deployment is encouraged to attend.

Please feel free to add agenda items (and your IRC nick in parenthesis).

Agenda for next meeting

  • Announcements
    • OpenInfra Summit CFP ends May 29, 2024
  • Actions from last meeting
  • Specs Review
  • Open discussion

Upcoming Project Renames

(any additions should mention original->new full names and link to the corresponding project-config rename change in Gerrit) Changes should have their topic set to project-rename.

Previous meetings

Previous meetings, with their notes and logs, can be found at http://eavesdrop.openstack.org/meetings/infra/ and earlier at http://eavesdrop.openstack.org/meetings/ci/