Jump to: navigation, search

Difference between revisions of "Meetings/InfraTeamMeeting"

(Agenda for next meeting)
(Agenda for next meeting)
(186 intermediate revisions by 10 users not shown)
Line 10: Line 10:
  
 
* Announcements
 
* Announcements
** OpenStack feature freeze this week.
+
** OpenInfra Summit CFP ends May 29, 2024
  
 
* Actions from last meeting
 
* Actions from last meeting
Line 17: Line 17:
  
 
* Topics
 
* Topics
** Bastion host (ianw 20220830)
+
** Upgrading Old Servers (clarkb 20230627)
*** worth moving ansible/openstacksdk to a venv?  system-config jobs first then production
 
*** c.f. https://review.opendev.org/c/opendev/system-config/+/847700
 
*** bastion host OS upgrade.  prioin-place?  new host?  wait until have time to return to some of the bootstrapping/parallel job work?
 
** Upgrading Bionic servers to Focal/Jammy (clarkb 20220830)
 
 
*** https://etherpad.opendev.org/p/opendev-bionic-server-upgrades
 
*** https://etherpad.opendev.org/p/opendev-bionic-server-upgrades
** Mailman 3 (clarkb 20220830)
+
*** https://etherpad.opendev.org/p/opendev-focal-server-upgrades
*** https://review.opendev.org/c/opendev/system-config/+/851248 Still very much WIP but worth a look at this point
+
*** Started looking at the wiki there are rough notes at: https://etherpad.opendev.org/p/opendev-bionic-server-upgrades#L58
*** Working through migration testing now.
+
*** Tonyb looking at cacti and the wiki as next items.
** Gerrit 08:00 UTC load issues (clarkb 20220830)
+
** AFS Mirror cleanups (clarkb 20240220)
*** Bumping up the http thread count
+
*** Ubuntu Xenial cleanups are starting to show up under topic:drop-ubuntu-xenial
*** Fallout of blocking IPs (users noticed)
+
*** Can followup with webserver log processing to determine which other mirrors may be dead.
*** We should work through this slowly as the OpenStack release is approaching.
+
** Building Ubuntu Noble Nodes (clarkb 20240416)
** Jaeger tracing server (for Zuul) (corvus 20220830)
+
*** Mirrors for x86_64 and arm64 are in place. We should be able to add image builds to nodepool.
*** Zuul will be adding OpenTelemetry tracing support. Should OpenDev run a Jaeger tracing server?
+
** Gerrit 3.9 Upgrade Planning (clarkb 20240423)
*** See https://zuul-ci.org/docs/zuul/latest/developer/specs/tracing.html
+
*** Upgrade prep notes are going in https://etherpad.opendev.org/p/gerrit-upgrade-3.9
** Fedora 36 Rollout (clarkb 20220830)
+
*** https://www.gerritcodereview.com/3.9.html Release Notes
*** Do we need to wait for OpenStack to release first?
+
*** Planning to upgrade the Gerrit server on May 31, 2024 from 1600-1700 UTC
*** We'll update the nodeset and most jobs will switch automatically.
+
** Linaro Cloud SSL Cert Renewal (clarkb 20240521)
*** Will we remove Fedora 35 next?
+
*** It has been a couple of months and we need to renew the cert again. Should be documented now. Any volunteers?
  
 
* Open discussion
 
* Open discussion
Line 44: Line 40:
 
Changes should have their topic set to project-rename.
 
Changes should have their topic set to project-rename.
  
* Rename foo/example -> bar/example: https://review.opendev.org/123456
+
* Rename example/foo -> example/bar: https://review.opendev.org/c/openstack/project-config/+/123456
  
 
== Previous meetings ==
 
== Previous meetings ==
 
Previous meetings, with their notes and logs, can be found at http://eavesdrop.openstack.org/meetings/infra/ and earlier at http://eavesdrop.openstack.org/meetings/ci/
 
Previous meetings, with their notes and logs, can be found at http://eavesdrop.openstack.org/meetings/infra/ and earlier at http://eavesdrop.openstack.org/meetings/ci/

Revision as of 16:11, 21 May 2024

Weekly Project Infrastructure team meeting

The OpenDev Team holds public weekly meetings in #opendev-meeting on OFTC, Tuesdays at 1900 UTC. Everyone interested in infrastructure and process surrounding automated testing and deployment is encouraged to attend.

Please feel free to add agenda items (and your IRC nick in parenthesis).

Agenda for next meeting

  • Announcements
    • OpenInfra Summit CFP ends May 29, 2024
  • Actions from last meeting
  • Specs Review
  • Open discussion

Upcoming Project Renames

(any additions should mention original->new full names and link to the corresponding project-config rename change in Gerrit) Changes should have their topic set to project-rename.

Previous meetings

Previous meetings, with their notes and logs, can be found at http://eavesdrop.openstack.org/meetings/infra/ and earlier at http://eavesdrop.openstack.org/meetings/ci/