Difference between revisions of "Watcher Meeting Agenda"
Antoinecabot (talk | contribs) m (→12/9/2015) |
Antoinecabot (talk | contribs) (→12/9/2015) |
||
Line 8: | Line 8: | ||
** more info on accommodations and agenda coming later | ** more info on accommodations and agenda coming later | ||
** Watcher code has been tagged 0.21.0 (mitaka-1) and python-watcherclient as 0.20.0 (mitaka-1) | ** Watcher code has been tagged 0.21.0 (mitaka-1) and python-watcherclient as 0.20.0 (mitaka-1) | ||
+ | ** Doc is up-to-date on [https://factory.b-com.com/www/watcher/doc/watcher/index.html] | ||
* '''Review Action Items''' | * '''Review Action Items''' | ||
+ | ** Watcher | ||
+ | *** Glossary has been merged for mitaka-1 [https://review.openstack.org/#/c/246370/] | ||
+ | *** A lot of current reviews are related to code refactoring [https://review.openstack.org/#/q/status:open+project:openstack/watcher+branch:master+topic:bp/glossary-related-refactoring,n,z] | ||
+ | *** tpeoples has submitted devstack integration code [https://review.openstack.org/#/c/254584/] | ||
+ | *** A big thank you to Darren Shaw & Gábor Antal for there patches | ||
+ | ** Watcher specs | ||
+ | *** A review is in progress on thermal optimization specs [https://review.openstack.org/#/c/252268/] | ||
+ | *** A move to implemented state for telemetry integration [https://review.openstack.org/#/c/254130/] | ||
* '''Blueprint/Bug Review and Discussion''' | * '''Blueprint/Bug Review and Discussion''' | ||
* '''Open Discussion''' | * '''Open Discussion''' |
Revision as of 11:05, 9 December 2015
Weekly Meetings
Contents
12/9/2015
- Roll Call
- Announcements
- Review Action Items
- Watcher
- Watcher specs
- Blueprint/Bug Review and Discussion
- Open Discussion
12/2/2015
- Roll Call
- Announcements
- mid-cycle meetup details
- versionning added to launchpad (mitaka-1 : today, mitaka-2 : 01/21/16, mitaka-3 : 03/03/16)
- as we are using commonly etherpad, I started a new one to reference all of them [8]
- Review Action Items
- Documentation :
- a Glossary has been added to the Watcher documentation and MUST now be reviewed [9] before code refactoring
- an architecture page has been updated with the current architecture diagram [10]
- do we need to put this diagram in watcher-specs to work on Watcher v2 architecture ? (or we wait for the mid-cycle ?)
- Documentation :
- Blueprint/Bug Review and Discussion
- we should merge all stable code for mitaka-1 and tag the current version
- Intel split up this BP [11] before writing associated specs
- Please review:
- Taylor split up this BP [12] - still a TODO, will have done by 12/3
- bcom has some refactoring to do [13] after merging the glossary [14] -> should be done today
- bcom will submit a BP to have a performance indicator associated with the action plan (like 10% reduction of energy consumption)
- could create-net submit a BP regarding the "consolidation rule" modeling ?
- we should set priority for BP [15]
- Open Discussion
- how to deal with integration tests in the future ?
- DevStack plugin is mostly done but having some keystone conf issues to work through. Should have up for review by end of week (tpeoples)
11/25/2015
- Roll Call
- Announcements
- mid-cycle meetup details
- wiki page related to Watcher architecture v2 is live [16]
- WIP rule on reviews (using -1 on workflow if it is a work in progress)
- Review Action Items
- Blueprint/Bug Review and Discussion
- we should define series for Watcher on Launchpad (for blueprints deadline), should we use the current OpenStack versionning (Mitaka-N every 2 months) ?
- Intel should split this BP [22] before writing associated specs
- this BP [23] should probably be split for each Watcher component
- bcom has some refactoring to do [24] after merging the glossary so please review it asap [25]
- bcom will submit a BP to have a performance indicator associated with the action plan (like 10% reduction of energy consumption)
- could create-net submit a BP regarding the "consolidation rule" modeling ?
- we should set priority for BP [26]
- Open Discussion
11/18/2015
- Roll Call
- Announcements
- regular meeting started targeting a POC for thermal optimization using Watcher
- ad-hoc meeting with ICCLab and Create-Net on thursday
- Review Action Items
- Developments for Ceilometer integration [27]
- Development for loading optimization Strategies dynamically with Stevedore [28]
- Specification for blueprint telemetry-integration has been written in watcher-specs and can be reviewed [29]
- Documentation :
- a Glossary has been added to the Watcher documentation and is currently being reviewed [30]
- writing some UML diagrams with an Ascii description : testing of the tool used in Nova, named Jia.
- Intel is working on the spec for the energy minimization PoC and it should be up for review soon.
- Blueprint/Bug Review and Discussion
- New blueprint added with the following title : Add new actions in Watcher that can be used in Action Plan produced by a strategy.
- Open Discussion
11/11/2015 Agenda
- Roll Call
- 11/11 is a day off in France so we will have a limited french team for today
- Announcements
- ICCLab@ZHAW first participation - short intro
- University Applied Research Lab focused on cloud computing, ~30 people, considering many different aspects energy, storage, networking, paas, serivce lifecycles, etc - http://blog.zhaw.ch/icclab/
- Energy related activities mainly in Openstack context funded by EU project GEYSER - http://www.geyser-project.eu/
- Have developed basic energy monitoring tool (kwapi based), deferred workload tool integrated with Horizon (working on more complex scheduler), rudimentary load consolidation mechanism
- Strong open source philosophy; would be happy to work with others on this topic
- ICCLab@ZHAW first participation - short intro
- Review Action Items
- watcher-specs is now ready
- devstack plugin for Watcher (https://blueprints.launchpad.net/watcher/+spec/devstack-plugin)
- mid-cycle meetup details
- bug triage
- enquiry to change the weekly meeting time
- Blueprint/Bug Review and Discussion
- Open Discussion
- Topic - ways of integration nova lb with watcher
- https://goo.gl/NnW77j — overload
- https://goo.gl/t7MhWP — suspend/unsuspend
- https://goo.gl/13nJ9p — lb-rules
- Topic - ways of integration nova lb with watcher
11/4/2015 Agenda:
- Roll Call
- Announcements
- Remark from ttx, do not use the name "OpenStack Watcher"
- Review Action Items
- Actions from Tokyo (https://etherpad.openstack.org/p/watcher-tokyo-architecture-session)
- @jwcroppe init watcher specs repo and add rights to core contrib
- @tpeoples look into getting devstack plugin for watcher working
- @acabot & @sballe schedule the mid-cycle meetup
- @dtardivel move all current bugs to launchpad
- Actions from Tokyo (https://etherpad.openstack.org/p/watcher-tokyo-architecture-session)
- Blueprint/Bug Review and Discussion
- Open Discussion
- Discuss use of ceilosca or ceilometer to collect metrics
- How to deal with diagram on wiki ? Should we host them in specs repo ?
- Integrating OpenStack Nova LoadBalancer into Watcher project (discussed at Tokyo Summit)
10/21/2015 Agenda:
- Roll Call
- Announcements
- Review Action Items
- mailing intro on openstack-dev mailing list
- Code migration from Stackforge
- create Watcher specs repo
- Watcher tools repo
- Tokyo Agenda
- Blueprint/Bug Review and Discussion
- Open Discussion
- Discuss opnfv doctor
10/14/2015 Agenda:
- Roll Call
- remember our meeting will take place on #openstack-meeting-3
- Announcements
- recording everyday success
- Review Action Items
- write down the mailing intro for Watcher
- Tokyo Agenda
- create Watcher specs repo
- Blueprint/Bug Review and Discussion
- Open Discussion
10/07/2015 Agenda:
- review the talk proposal for Tokyo (still in standby mode) https://docs.google.com/presentation/d/1gdb3PcC8KnKvs9PmblludTAqXmBI92t3zxTsX0BmPE0/edit?usp=sharing
- Intel & IBM status on resources for Watcher
- all blueprints wrote down on launchpad https://launchpad.net/watcher
- Watcher wiki update
- Weekly IRC meeting
- When do we want to have these meetings?
- tpeoples> sballe: if we want to keep 1500 UTC the only day that is available is Friday. There is a slot open for 1400 UTC on Tuesday, Wednesday. Slots open for Wednesday at 1600. i uploaded the ical into google calendar: https://www.google.com/calendar/render?pli=1#main_7%7Cweek-2+23371+23377+23373
- Mailing list creation
- Quick comment: OpenStack doesn;t run seperrate mailing lists. We should use the openstack-dev@lists.openstack.org mailing list with "[watcher]" in the subject.
- Tokyo summit actions
09/30/2015 Agenda:
Announcements
- Re: OpenStack Watcher repos: The Stackforge in this list: https://wiki.openstack.org/wiki/Stackforge_Namespace_Retirement will be moved automatically to OpenStack repos. Watcher is on the list so we do not have to do anything.
- These changes are scheduled to occur on October 17, 2015.
- review the OpenStack Watcher vision document https://docs.google.com/document/d/1PAEK3eYi9Et2lpc6pT1JU2AoVSaivMmeHmj62qajqm8/edit#
- review the current architecture https://docs.google.com/presentation/d/1-AEqDPAOaLva4N9PkBhvQ070SxhSFPiNnLiUFKiSJj0/edit#slide=id.gca3d12c11_2_52
- review the actions list from our last workshop https://etherpad.openstack.org/p/watcher-workshop-rennes
- [sballe] Setup cadence for weekly meetings - work out an acceptable time for the group
- [acabot] Send out email to introducing Watcher to mailing lists (pre-requisites would be to have the wiki upadated, vision doc, etc.)
- [acabot] Clean up wiki document, including alignment with the Watcher vision document
- [sballe] Set up Git repositories on openstack.org
- [JeD56] Transfer code from existing StackForge repositories to Gerrit (after sballe gets the repositories configured)
- [jwcroppe] Create initial mission statement and vision doc and send out to team (jwcroppe: done - see "Watcher Vision Doc" in the "Key Links" section)
- [dtardivel] Add a link to the API generated doc in Watcher wiki
- [all] Write down blueprints in LaunchPad from the use cases list
- Tokyo summit actions
- [jwcroppe, sballe, acabot] Prepare slides for Watcher talk (still in 'standby' mode)
- [sballe] Figure out a place where we can do an ad-hoc talk
- Talk to Nova, Ceilometer, etc. PTLs to inform them of the project
- [acabot, jwcroppe, sballe] Consider a Nova unconference session to introduce Watcher
- [sballe] Setup a meeting with Monty Taylor to introduce him to Watcher
- [sballe, acabot, jwcroppe] Evangelize Watcher with other folks (e.g., jaypipes, bauzas, Perry Myers from Red Hat, folks from Rackspace, Julien Danjou from Red Hat)
Brief progress reports
Open Discussion