Jump to: navigation, search

Difference between revisions of "StarlingX/Test"

Line 48: Line 48:
 
*ISO: stx-2018-09-05-103.iso
 
*ISO: stx-2018-09-05-103.iso
 
*ISO: stx-2018-09-06-104.iso
 
*ISO: stx-2018-09-06-104.iso
 +
*ISO: stx-2018-09-06-106.iso
 +
*ISO: stx-2018-09-06-107.iso
 +
*ISO: stx-2018-09-06-108.iso
 +
*ISO: stx-2018-09-06-110.iso
 +
*ISO: stx-2018-09-06-111.iso
 
** All these iso images are having the same behavior
 
** All these iso images are having the same behavior
 +
 
*Installation [PASS]: 4 TCs Passed, 0 TCs Failed.
 
*Installation [PASS]: 4 TCs Passed, 0 TCs Failed.
*Provisioning [FAIL]: 1 TCs Passed, 3 TCs Failed.
+
*Provisioning [FAIL]: 0 TCs Passed, 6 TCs Failed.
** Error during 2nd controller installation.
+
** Error during add persistent storage to master controller and unlocking
** Error during computes installation.
+
** Error during add persistent storage to 2nd controller, installation and unlocking.
 +
** Error during computes installation and provisioning.
 
*Sanity [FAIL]: 9 TCs Paseed, 10 TCs Failed.
 
*Sanity [FAIL]: 9 TCs Paseed, 10 TCs Failed.
** As consequence from computes installation/provisioning failure.
+
** As consequence from computes and controller installation/provisioning failure.
*Total: 27 TCs Executed, 14 TCs Passed, 13 TCs Failed.
+
*Total: 29 TCs Executed, 13 TCs Passed, 16 TCs Failed.
*More details regarding results, please contact elio.martinez.monroy@intel.com
+
*More details regarding results, please contact elio.martinez.monroy@intel.com and juan.carlos.alonso@intel.com
*Most of the failures are related with the compute installation.
+
 
 
**Full logs and reports will be uploaded soon
 
**Full logs and reports will be uploaded soon
 
*Related bugs:
 
*Related bugs:

Revision as of 18:59, 11 September 2018

StarlingX Test Sub-project

Team Information

  • Project Lead: Ada Cabrales <ada.cabrales@intel.com>
  • Technical Lead: Jose Perez <jose.perez.carranza@intel.com>
  • Quality Assurance Engineer: Elio Martinez <elio.martinez.monroy@intel.com>
  • Contributors:

Team Objective / Priorities

  • Responsible for verification of StarlingX, including automated and manual testing

Project calls

Bi-weekly meetings on Tuesdays at 9:00am PDT / 1600 UTC

Agenda and meeting minutes are in this etherpad

Story Board Tags

All story board stories created for this team should use the tag "stx.test" and the prefix [Test]

Team Work Items

Latest ISO image Sanity Summary

  • ISO: stx-2018-08-30-97.iso
  • ISO: stx-2018-08-31-98.iso
  • ISO: stx-2018-09-01-99.iso
  • ISO: stx-2018-09-02-100.iso
  • ISO: stx-2018-09-03-101.iso
  • ISO: stx-2018-09-04-102.iso
  • ISO: stx-2018-09-05-103.iso
  • ISO: stx-2018-09-06-104.iso
  • ISO: stx-2018-09-06-106.iso
  • ISO: stx-2018-09-06-107.iso
  • ISO: stx-2018-09-06-108.iso
  • ISO: stx-2018-09-06-110.iso
  • ISO: stx-2018-09-06-111.iso
    • All these iso images are having the same behavior
  • Installation [PASS]: 4 TCs Passed, 0 TCs Failed.
  • Provisioning [FAIL]: 0 TCs Passed, 6 TCs Failed.
    • Error during add persistent storage to master controller and unlocking
    • Error during add persistent storage to 2nd controller, installation and unlocking.
    • Error during computes installation and provisioning.
  • Sanity [FAIL]: 9 TCs Paseed, 10 TCs Failed.
    • As consequence from computes and controller installation/provisioning failure.
  • Total: 29 TCs Executed, 13 TCs Passed, 16 TCs Failed.
  • More details regarding results, please contact elio.martinez.monroy@intel.com and juan.carlos.alonso@intel.com