Jump to: navigation, search

Search results

  • Kilo Design Sessions https://etherpad.openstack.org/p/barbican-kilo-design-sessions Integration https://etherpad.openstack.org/p/barbican-kilo-integration
    856 bytes (112 words) - 19:21, 6 February 2015
  • 48 bytes (0 words) - 11:27, 16 March 2015
  • documents security related details for the Sahara project in the OpenStack Kilo release. ? ? ? ? ? ? ? ?
    692 bytes (15 words) - 17:35, 23 October 2014
  • (Mar 12)19General FeatureFreeze, StringFreeze, DepFreeze kilo-326April 29Release candidates162330Kilo Release (2015.1.0)May 71421Design Summit (Vancouver)
    4 KB (0 words) - 13:16, 10 February 2015
  • nodes. Please refer to Mellanox website for the latest OFED version For Kilo release information, please refer to the relevant OS as follows: Redhat7
    1 KB (169 words) - 15:34, 31 October 2016
  • OpenStack Juno added inbox support to request VM access to virtual network via SR-IOV NIC. With the introduction of SR-IOV based NICs, the traditional
    1 KB (156 words) - 08:48, 22 July 2015
  • Mechanism Driver API. This page is deprecated. Please refer to Mellanox-Neutron-Kilo-InfiniBand This driver supports Mellanox embedded switch functionality as
    2 KB (182 words) - 09:04, 6 October 2016
  • openstack.org/p/kilo-summit-sahara-edp https://etherpad.openstack.org/p/kilo-summit-sahara-ux https://etherpad.openstack.org/p/kilo-summit-sahara-production-clusters
    22 KB (1,586 words) - 16:32, 24 March 2015
  • cs/specs/kilo/default-templates.html Improved secret storage utilizing Barbican http://specs.openstack.org/openstack/sahara-specs/specs/kilo/improved-secret-storage
    499 bytes (70 words) - 11:31, 16 March 2015
  • Huawei and Intel successfully launched 1st PRC OpenStack Hackathon at April. During the 1st hackathon, there are 16 OpenStackers from Huawei, Intel and
    3 KB (447 words) - 01:40, 6 August 2015
  • FeatureFreeze List of approved FF exceptions for Sahara (Kilo release cycle): Add timeouts for infinite polling for smth Provide default templates for
    411 bytes (40 words) - 15:25, 19 March 2015
  • in terms of design, implementation, and reviews [3]. My focus during the Kilo cycle has, and, will be to improve the quality of our code (reduce bug count
    2 KB (261 words) - 01:05, 14 March 2015
  • Please see https://etherpad.openstack.org/p/kilo-tripleo-midcycle-meetup for details until the dates are confirmed.
    115 bytes (18 words) - 18:45, 2 December 2014
  • notes page for OpenStack Kiloː https://wiki.openstack.org/wiki/ReleaseNotes/Kilo#OpenStack_Bare_Metal_service_.28Ironic.29 Official documentation and guides
    817 bytes (113 words) - 19:15, 29 April 2015
  • org/ A list of all etherpads is available at Summit/Kilo/Etherpads On the first day of the Kilo summit, we'll have OpenStack cross-project workshops
    4 KB (482 words) - 16:32, 24 March 2015
  • Join us for the Barbican mid-cycle sprint for the Kilo cycle. The etherpad proposing what should be covered is here. February 16-18, 2015 (Mon-Wed)
    478 bytes (57 words) - 21:13, 19 January 2015
  • Join us for the Designate mid-cycle sprint for the Kilo cycle. We are planning a 4 day hackathon for Designate - where we can try and get quick turn around
    383 bytes (59 words) - 18:46, 5 January 2015
  • detailed in the table below) that need to be implemented and landed in the Kilo release. Details on the background for this work is at this etherpad, this
    3 KB (106 words) - 09:18, 10 March 2015
  • exchange of identification and confirm key fingerprints at the OpenStack Kilo Design Summit in LOCATION AND TIME TBD. If you plan to join us, please bring
    1 KB (146 words) - 00:19, 27 October 2014
  • Original session proposal: https://etherpad.openstack.org/p/puppet-paris-summit-proposal Etherpad of the session: https://etherpad.openstack.org/p/pu
    7 KB (1,003 words) - 21:16, 2 April 2015

View (previous 20 | next 20) (20 | 50 | 100 | 250 | 500)