This is intended to be a living document sharing the common conventions and
+
This is intended to be a living document sharing the common conventions and mechanisms used in managing integrated projects in OpenStack.
mechanisms used in managing core projects within the OpenStack foundation.
 
  
 
= What is a PTL? =
 
= What is a PTL? =
  
Program Technical Lead
+
PTL means ''Program Technical Lead''. Each OpenStack [[programs|official program]] elects a technical lead who has final say over all things technical in that specific program (and all the code repositories within it).
 +
 
  
 
= What it takes to be a PTL =
 
= What it takes to be a PTL =
  
== Prerequisites ==
+
==== Prerequisites ====
  
You should already familiar with contributing to
+
You should already familiar with contributing to OpenStack and tools related to making code updates and getting them in place, in particular:
OpenStack and tools related to making code updates and getting them in place, in particular:
 
  
 
* How the [[ReleaseCycle]] works
 
* How the [[ReleaseCycle]] works
 
* Our [[BranchModel]]
 
* Our [[BranchModel]]
 +
* Our [[GerritJenkinsGit|Gerrit-driven workflow]]
 +
 +
==== Availability ====
 +
 +
The PTL is expected to have sufficient time to dedicate to interaction with the release team. That includes presence at the 1:1 sync points and weekly cross-project meetings, but also extra availability on milestone and release weeks. The dates for milestones and releases being known well in advance, please make sure you have sufficient free time on those special weeks. If your job doesn't give you sufficient free time to dedicate to release management, please consider stepping down and let someone with more time on their hands taking over.
 +
 +
 +
= Organizing the Design Summit =
  
== Availability ==
+
The PTL is responsible for selecting and scheduling proposed sessions at the Design Summit immediately following his or her election. See [[Summit/SchedulingForPTLs]] for details on the process.
  
The PTL is expected to have sufficient time to dedicate to interaction with the release team. That includes presence at the weekly meetings, but also extra availability on milestone and release weeks. The dates for milestones and releases being known well in advance, please make sure you have sufficient free time on those special weeks. If your job doesn't give you sufficient free time to dedicate to release management, please consider stepping down and let someone with more time on their hands taking over.
 
  
 
= Interactions with the Release team =
 
= Interactions with the Release team =
  
== Participating to the weekly IRC meeting ==
+
=== Participating to weekly 1:1 sync points ===
  
The release manager will review the state of each project against
+
PTLs sync their project status and roadmap with the Release Management team every week during a 15-min 1:1 sync point. this avoids wasting too much time in the cross-project meeting discussing project-specific matters like roadmap updates. The scheduled time appears at the bottom of [[Meetings/ProjectMeeting|this]] page.
the current position in the release cycle in the weekly OpenStack [[Project and release status meeting|Meetings/ProjectMeeting]].
 
  
For example, during the folsom-1 milestone development timeframe, he will review for Keystone:
+
During this 1:1 sync point, the release manager will review the state of the integrated project against the current position in the release cycle. For example, during the juno-2 milestone development timeframe, he will review for Keystone: https://launchpad.net/keystone/+milestone/juno-2 .
* https://launchpad.net/keystone/+milestone/folsom-1
 
  
=== Actions ===
+
During that time, the PTL will also be able to ask questions, mention news items and add cross-project meeting topics.
  
A PTL should be on the meeting, or have a delegate that can report on progress,
+
=== Participating to the weekly cross-project IRC meeting ===
make calls to action, and generally be prepared to answer questions about the
 
project from the general community.
 
  
== Organising the Design Summit ==
+
In addition to the 1:1 sync points, we also discuss cross-project issues potentially affecting the integrated release at the weekly [[Meetings/ProjectMeeting|cross-project release meeting]].
  
The PTL is responsible for selecting and scheduling proposed sessions at the Design Summit immediately following his or her election. See [[Summit/SchedulingForPTLs]] for details on the process.
+
In addition to exposing the news from the 1:1 sync points and other programs, specific agenda topics requested by PTLs make up the meeting agenda. This meeting is the opportunity to raise issues and increase coordination between projects and ensure a successful integrated release.
 +
 
 +
The PTL should be present at the meeting, or have a delegate that can report on progress, make calls to action, and generally be prepared to answer questions about the project from the general community.
  
== Maintaining Cycle plans ==
+
=== Maintaining Cycle plans ===
  
The PTL is expected to produce and maintain general objectives for the development cycle in the cycle plan. This plan contains the blueprints that are expected to be worked on during the cycle. You can find it at blueprints.launchpad.net/PROJECT/CYCLE, for example for Nova in Essex: https://blueprints.launchpad.net/nova/essex.
+
The PTL is expected to produce and maintain general objectives for the development cycle in the cycle plan. This plan contains the blueprints that are expected to be worked on during the cycle. You can find it at blueprints.launchpad.net/PROJECT/CYCLE, for example for Nova in Juno: https://blueprints.launchpad.net/nova/juno .
  
You can add or remove blueprints in that plan by using the ''series goal'' field in the blueprints. Blueprints in the cycle plan should have an indicative '''milestone''' set, indicating when in the cycle the feature is expected to be completed. Blueprints in the cycle plan should also have an '''assignee''': the person or development group that has committed to delivering the feature in OpenStack.
+
You can add or remove blueprints in that plan by setting a '''priority''' and a '''milestone target''' in the blueprints (an automated script will adjust the series goal to match the milestone target). Blueprints in the cycle plan should have an indicative '''milestone''' set, indicating when in the cycle the feature is expected to be completed. Blueprints in the cycle plan should also have an '''assignee''': the person or development group that has committed to delivering the feature in OpenStack.
  
== Maintaining Milestone plans ==
+
If you're using a -specs repository, the [http://git.openstack.org/cgit/openstack-infra/release-tools/tree/spec2bp.py spec2bp.py] tool can be used when a spec is approved, to automatically set the corresponding blueprint fields accordingly.
  
This cycle plan trickles down into milestone plans, for each milestone. Milestone plans appear at: launchpad.net/PROJECT/+milestone/MILESTONE, for example for Nova on essex-3: [https://launchpad.net/nova/+milestone/essex-3]]. When a milestone is in progress, it's important to keep the status of the blueprints accurate: the assignee is supposed to keep the status current, and the PTL to ensure that the status reflects reality. See the [[Blueprints blueprints field reference] for more details.
+
=== Maintaining Milestone plans ===
  
== Maintaining Targeted bugs ==
+
This cycle plan trickles down into milestone plans, for each milestone. Milestone plans appear at: launchpad.net/PROJECT/+milestone/MILESTONE, for example for Nova on juno-3: https://launchpad.net/nova/+milestone/juno-3 . When a milestone is in progress, it's important to keep the status of the blueprints accurate: the assignee is supposed to keep the status current, and the PTL to ensure that the status reflects reality. See the [[Blueprints blueprints field reference] for more details.
  
The PTL can also target bugs that need to be fixed by a specific milestone. Those bugs will appear on the milestone plans, and be reviewed regularly during the weekly meetings.
+
=== Maintaining Targeted bugs ===
  
== Special actions on Milestone delivery week ==
+
The PTL can also target bugs that need to be fixed by a specific milestone. Those bugs will appear on the milestone plans, and be reviewed regularly during the weekly sync points.
  
==== Milestone-proposed cut (EOD Tuesday) ====
+
=== Special actions on Milestone delivery week ===
  
The deadline for merging new features is the end of the day on the Tuesday of the milestone delivery week. It is the responsibility of the PTL to make it so that at the end of the Tuesday, the milestone plan only contains ''Implemented'' or ''Deferred'' blueprints. If any blueprint is still open on the Wednesday, that means the PTL requires an (exceptional) '''deadline extension''' for that specific blueprint before the milestone-proposed branch is cut. So please make sure that list is reviewed and updated before the end of your Tuesday !
+
Starting with Juno, development milestones are just tagged directly on the master branch. The job of the PTL is to communicate to the release manager an appropriate SHA for tagging, sometimes between Tuesday and Thursday during the milestone delivery week.
  
By Tuesday EOD, the targeted bug list should also be cured into a list of release-critical bugs. Bugs that will not be fixed in the next two days (or that have no assignee) should be untargeted (or moved to the next milestone). This bug list becomes a ''don't release before those bugs are fixed'' list, so it should be kept as '''small''' as possible.
+
In preparation for that, it's a good idea to refine the milestone plan so that the only incomplete items are the things you are waiting for before tagging: the milestone page becomes your "remaining TODO before tag" tracker. Everything else should be deferred to the next milestone.
  
A few hours after EOD, the milestone-proposed branch is cut. This branch is for bugfixes only. Bugs that are fixed in master are set to FixCommitted, bugs that are fixed in milestone-proposed are set to FixReleased. The last build of milestone-proposed becomes the milestone delivery.
+
When the milestone SHA is determined, the milestone plan should only contain ''Implemented'' blueprints, and ''Fix Committed'' bugs: everything else should be deferred to the next development milestone.
  
=== Backporting fixes to milestone-proposed (Wednesday/Thursday) ===
+
Upon reception of this milestone SHA, the release manager pushes the tag, sets all FixCommitted bugs to FixReleased on the target milestone, generates and uploads the corresponding tarball, and marks the milestone released.
  
Release-blocking bugs should be:
+
=== Special actions between Feature freeze and RC1 ===
# targeted to the milestone
 
# merged in master branch (FixCommitted)
 
# backported to milestone-proposed
 
# merged in milestone-proposed (FixReleased)
 
  
Changes proposed to milestone-proposed can be accepted by PTLs and the release manager. The policy for accepting those changes is to doublecheck that the fix is targeted to the milestone, and has landed in master first.
+
At the end of the cycle, after the last development milestone, we are under [[FeatureFreeze]] until we publish a first release candidate. During [[FeatureFreeze]], the PTL and the core reviewers should ensure that no feature makes its way into the master branch, unless it was granted a feature freeze exception. Feature freeze exceptions are discussed between the PTL and the release manager, generally looking for consensus. In case no consensus can be reached on a feature freeze exception, the PTL has final say.
  
Instructions on backporting changes can be found [[GerritJenkinsGithub#Authoring_Changes_for_milestone-proposed|here]].
+
We use the RC1 milestone page to track the work that's left to do before we can issue the first release candidate. All known release blockers must be targeted to the RC milestone. Once that list is empty, we can publish the first release candidate (RC1). It is therefore important to keep that list current and reasonable. At this point we also create the release branch (for example proposed/juno for the Juno release), and the master branch is reopened for development ([[FeatureFreeze]] ends).
  
=== Milestone day (EOD Thursday) ===
+
=== Special actions between RC1 and final release ===
  
The buglist on the milestone plan becomes a way to communicate with the release team. If the buglist is all FixReleased, that means the milestone can be released by the release team, starting on Thursday morning. If there are bugs left, they act as a '''blocker''' until they are fixed in milestone-proposed, or untargeted. It is the PTL responsibility to make sure that the list accurately represents the "releasability" of their project :)
+
The RC1 will be used as the release, unless a release-critical bug is found that warrants a release candidate respin. Release-critical bugs that may trigger a respin should be tagged '''series-rc-potential''' (for example ''juno-rc-potential''), and are reviewed by the PTL and the release manager to see if they are worth a respin. As time passes, we get more picky about what should trigger a respin and what should be documented as a known issue. If a respin is warranted, we open a new milestone page to track the work to complete before the new RC can be published. It is recommended to only target bugs which already have a fix merged in master.
  
Please plan to be extra available on release cut day, the success of a milestone depends on it.
+
We use two different statuses for master and proposed/* merges, which allows tracking of RC bugs:
 +
* FixCommitted means "merged in master branch"
 +
* FixReleased means "merged in proposed/foo branch"
  
== Special actions during the RC period ==
 
  
At the end of the cycle, after the last milestone, we enter the release candidates period.
+
Changes proposed to proposed/* can be accepted by PTLs and the release manager. The policy for accepting those changes is to doublecheck that the fix is targeted to the milestone, '''and''' has landed in master first.
  
We use release candidate milestone pages to track the work that's left to do before we can issue the release candidate. All known release blockers must be targeted to the RC milestone. Once that list is empty, we can publish a release candidate (RC1). This release candidate will be used as the release, unless a release-critical bug is found that warrants a release candidate respin. After RC1 the master branch is reopened for development, and only release-critical bugs are backported to the release branch.
+
The process for backporting changes to proposed/* is described [[GerritJenkinsGit#Submit_Changes_in_master_to_proposed.2F.2A|here]].
  
Release-critical bugs that may trigger a respin should be tagged '''series-rc-potential''' (for example ''folsom-rc-potential''), and are reviewed by the PTL and the release manager to see if they are worth a respin. As time passes, we get more picky about what should trigger a respin and what should be documented as a known issue. If a respin is warranted, we open a new milestone page to track the work to complete before the new RC can be proposed.
 
  
 
= Interacting with Launchpad =
 
= Interacting with Launchpad =
  
== Teams ==
+
=== Teams ===
  
Each core project has a project on launchpad:
+
Each integrated project has a project page on launchpad:
 
* https://launchpad.net/projectname
 
* https://launchpad.net/projectname
 
* links to Code, Documentation and Community pages
 
* links to Code, Documentation and Community pages
Line 103: Line 103:
 
Each project typically has multiple teams associated with it (the same person :
 
Each project typically has multiple teams associated with it (the same person :
 
* <projectname>-drivers (https://launchpad.net/~projectname-drivers)
 
* <projectname>-drivers (https://launchpad.net/~projectname-drivers)
  - folks responsible for maintaining the roadmap and objectives
+
** folks responsible for maintaining the roadmap and objectives
  - can manage milestones, blueprints and blueprint settings
+
** can manage milestones, blueprints and blueprint settings
  - includes the PTL and anybody the PTL delegate this authority to
+
** includes the PTL and anybody the PTL delegate this authority to
 +
** should include the Release managers team (~openstack-release) so that they can help in setting bug status
 
* <projectname>-bugs (https://launchpad.net/~projectname-bugs)
 
* <projectname>-bugs (https://launchpad.net/~projectname-bugs)
  - can set importance and specific statuses to bugs
+
** can set importance and specific statuses to bugs
  - core devs from Gerrit and LP -drivers team are generally part of it
+
** core devs from Gerrit and LP -drivers team are generally part of it
 +
* <projectname>-coresec (https://launchpad.net/~projectname-coresec)
 +
** will be added to private security bugs
 +
** core devs with interest and time for helping with security issues
  
There is also a generic ~projectname team (https://launchpad.net/~projectname) but it's not really used for anything.
+
 
 +
There is also sometimes a generic ~projectname team (https://launchpad.net/~projectname) but it's not really used for anything anymore.
  
 
=== Bugs ===
 
=== Bugs ===
Line 116: Line 121:
 
https://bugs.launchpad.net/projectname
 
https://bugs.launchpad.net/projectname
  
Receiving bug reports and specific, (ideally reproducible) problems from the
+
Receiving bug reports and specific, (ideally reproducible) problems from the community. Anyone can open a bug report against a project.
community. Anyone can open a bug report against a project.
 
  
 
Bugs can be used to indicate small-sized feature additions or work tasks as well. Since bugs can be tagged (where blueprints can't), bugs can be a useful medium for triaging and working against lists of issues to achieve a specific goal.
 
Bugs can be used to indicate small-sized feature additions or work tasks as well. Since bugs can be tagged (where blueprints can't), bugs can be a useful medium for triaging and working against lists of issues to achieve a specific goal.
Line 125: Line 129:
 
Bugs are generally completely open. A special case of bug report is a security vulnerability. In general, these bugs
 
Bugs are generally completely open. A special case of bug report is a security vulnerability. In general, these bugs
 
are submitted as ''embargoed security'' bugs and only the reporter and the OpenStack [[VulnerabilityManagement]] team see
 
are submitted as ''embargoed security'' bugs and only the reporter and the OpenStack [[VulnerabilityManagement]] team see
these bugs initially. Access is controlled through bug "subscription". The PTL of the affected project is quickly added to the access list, and additional folks can be subscribed from any of the people currently able to see the issue. As soon as possible, embargoed security issues are unembargoed and accessible by everyone.
+
these bugs initially. Access is controlled through bug "subscription". The project security team (coresec) of the affected project is quickly added to the access list, and additional folks can be subscribed from any of the people currently able to see the issue. As soon as possible, embargoed security issues are unembargoed and accessible by everyone.
  
 
'''Please learn the meaning of the different fields in a bug (status, importance...) at: [[Bugs]]'''
 
'''Please learn the meaning of the different fields in a bug (status, importance...) at: [[Bugs]]'''
Line 140: Line 144:
 
that milestone.
 
that milestone.
  
=== Actions ===
+
==== Actions ====
  
A PTL should plan to review all new bugs on a frequent basis - at least weekly:
+
A PTL should make sure all new bugs are reviewed on a frequent basis - at least weekly:
 
* https://bugs.launchpad.net/keystone/+bugs?search=Search&field.status=New
 
* https://bugs.launchpad.net/keystone/+bugs?search=Search&field.status=New
  
Just prior to a milestone release, a PTL should go through all the bugs and
 
associate any that are "in progress" and likely to be fully committed by the
 
release, or in "fix committed" state to the milestone.
 
  
== Blueprints ==
+
=== Blueprints ===
  
 
https://blueprints.launchpad.net/projectname
 
https://blueprints.launchpad.net/projectname
  
Intended to be feature requests or project efforts. A blueprint may require one
+
We use blueprints to track incoming features and build a short-term roadmap. A blueprint may require one or more code commits to complete. Blueprints have a short description, link to spec, priority, delivery status, assignee, and can be targeted to a milestone. Anyone can propose a blueprint, but they should only appear in a milestone or a series plan if they are granted a '''priority''' and a '''target milestone''' by the PTL or one of the projects '''drivers'''.  
or more code commits to complete. Anyone can propose a blueprint. Blueprints
 
have a priority, a "design state", a delivery status, an assignee, and can
 
be associated with a series and/or milestone.
 
  
 
'''Please learn the meaning of the different fields in a blueprint at: [[Blueprints]]'''
 
'''Please learn the meaning of the different fields in a blueprint at: [[Blueprints]]'''
  
A blueprint is also used to propose features, and are typically used as discussion
+
==== Actions ====
points for future features in OpenStack Design Summits. To propose a feature, an
+
 
individual should create a blueprint, assign themselves (Assignee) to the
+
The milestone pages are used as a PTL communication tool, to reflect the PTL's current view on what's likely to land in the upcoming development milestones. A PTL should therefore strive to keep that view updated, by adding blueprints, setting priority and target milestones to correspond to the work being done. PTLs should also make sure that the ''implementation status'' is up to date, to accurately reflect progress.
blueprint, and then be prepared to discuss or develop how the feature may be
 
created and implemented.
 
  
=== Actions ===
+
Project-specific milestone plans are aggregated to build a single integrated release view at: [http://status.openstack.org/release/]
  
A PTL should set importance and map to milestones on all blueprints at the
+
As we get closer to the milestone delivery week, the PTL should review the blueprints and defer to the next milestone anything that is no longer likely to meet the milestone delivery date. Any such deferrals should be communicated as soon as possible.
beginning of a release cycle to make a map of how they expect the project to
 
progress.
 
  
Just prior to a milestone, the PTL should review the blueprints and update
 
delivery progress as well as update milestone settings if a blueprint is going
 
to slip.
 
  
== Answers ==
+
= Ask OpenStack =
  
 
[https://ask.openstack.org/ Ask OpenStack] is the preferred way for community to ask for support.  Anyone can open a question, and anyone can answer a question. Questions can be tagged by the project name, usually tagging is done by the person asking and/or by Ask moderators.
 
[https://ask.openstack.org/ Ask OpenStack] is the preferred way for community to ask for support.  Anyone can open a question, and anyone can answer a question. Questions can be tagged by the project name, usually tagging is done by the person asking and/or by Ask moderators.
Line 182: Line 173:
 
Answers can be linked to an existing bug report using the syntax lp:BUGNUMBER.  
 
Answers can be linked to an existing bug report using the syntax lp:BUGNUMBER.  
  
=== Actions ===
+
==== Actions ====
  
A PTL should plan to review open questions on a frequent basis - at least weekly:
+
A PTL should make sure open questions get reviewed on a frequent basis - at least weekly:
  
 
* website: https://ask.openstack.org/questions/scope:all/sort:activity-desc/tags:PROJECTNAME/
 
* website: https://ask.openstack.org/questions/scope:all/sort:activity-desc/tags:PROJECTNAME/
 
* RSS feed: https://ask.openstack.org/feeds/rss/?tags=PROJECTNAME
 
* RSS feed: https://ask.openstack.org/feeds/rss/?tags=PROJECTNAME

Revision as of 12:36, 4 July 2014

This is intended to be a living document sharing the common conventions and mechanisms used in managing integrated projects in OpenStack.

What is a PTL?

PTL means Program Technical Lead. Each OpenStack official program elects a technical lead who has final say over all things technical in that specific program (and all the code repositories within it).


What it takes to be a PTL

Prerequisites

You should already familiar with contributing to OpenStack and tools related to making code updates and getting them in place, in particular:

Availability

The PTL is expected to have sufficient time to dedicate to interaction with the release team. That includes presence at the 1:1 sync points and weekly cross-project meetings, but also extra availability on milestone and release weeks. The dates for milestones and releases being known well in advance, please make sure you have sufficient free time on those special weeks. If your job doesn't give you sufficient free time to dedicate to release management, please consider stepping down and let someone with more time on their hands taking over.


Organizing the Design Summit

The PTL is responsible for selecting and scheduling proposed sessions at the Design Summit immediately following his or her election. See Summit/SchedulingForPTLs for details on the process.


Interactions with the Release team

Participating to weekly 1:1 sync points

PTLs sync their project status and roadmap with the Release Management team every week during a 15-min 1:1 sync point. this avoids wasting too much time in the cross-project meeting discussing project-specific matters like roadmap updates. The scheduled time appears at the bottom of this page.

During this 1:1 sync point, the release manager will review the state of the integrated project against the current position in the release cycle. For example, during the juno-2 milestone development timeframe, he will review for Keystone: https://launchpad.net/keystone/+milestone/juno-2 .

During that time, the PTL will also be able to ask questions, mention news items and add cross-project meeting topics.

Participating to the weekly cross-project IRC meeting

In addition to the 1:1 sync points, we also discuss cross-project issues potentially affecting the integrated release at the weekly cross-project release meeting.

In addition to exposing the news from the 1:1 sync points and other programs, specific agenda topics requested by PTLs make up the meeting agenda. This meeting is the opportunity to raise issues and increase coordination between projects and ensure a successful integrated release.

The PTL should be present at the meeting, or have a delegate that can report on progress, make calls to action, and generally be prepared to answer questions about the project from the general community.

Maintaining Cycle plans

The PTL is expected to produce and maintain general objectives for the development cycle in the cycle plan. This plan contains the blueprints that are expected to be worked on during the cycle. You can find it at blueprints.launchpad.net/PROJECT/CYCLE, for example for Nova in Juno: https://blueprints.launchpad.net/nova/juno .

You can add or remove blueprints in that plan by setting a priority and a milestone target in the blueprints (an automated script will adjust the series goal to match the milestone target). Blueprints in the cycle plan should have an indicative milestone set, indicating when in the cycle the feature is expected to be completed. Blueprints in the cycle plan should also have an assignee: the person or development group that has committed to delivering the feature in OpenStack.

If you're using a -specs repository, the spec2bp.py tool can be used when a spec is approved, to automatically set the corresponding blueprint fields accordingly.

Maintaining Milestone plans

This cycle plan trickles down into milestone plans, for each milestone. Milestone plans appear at: launchpad.net/PROJECT/+milestone/MILESTONE, for example for Nova on juno-3: https://launchpad.net/nova/+milestone/juno-3 . When a milestone is in progress, it's important to keep the status of the blueprints accurate: the assignee is supposed to keep the status current, and the PTL to ensure that the status reflects reality. See the [[Blueprints blueprints field reference] for more details.

Maintaining Targeted bugs

The PTL can also target bugs that need to be fixed by a specific milestone. Those bugs will appear on the milestone plans, and be reviewed regularly during the weekly sync points.

Special actions on Milestone delivery week

Starting with Juno, development milestones are just tagged directly on the master branch. The job of the PTL is to communicate to the release manager an appropriate SHA for tagging, sometimes between Tuesday and Thursday during the milestone delivery week.

In preparation for that, it's a good idea to refine the milestone plan so that the only incomplete items are the things you are waiting for before tagging: the milestone page becomes your "remaining TODO before tag" tracker. Everything else should be deferred to the next milestone.

When the milestone SHA is determined, the milestone plan should only contain Implemented blueprints, and Fix Committed bugs: everything else should be deferred to the next development milestone.

Upon reception of this milestone SHA, the release manager pushes the tag, sets all FixCommitted bugs to FixReleased on the target milestone, generates and uploads the corresponding tarball, and marks the milestone released.

Special actions between Feature freeze and RC1

At the end of the cycle, after the last development milestone, we are under FeatureFreeze until we publish a first release candidate. During FeatureFreeze, the PTL and the core reviewers should ensure that no feature makes its way into the master branch, unless it was granted a feature freeze exception. Feature freeze exceptions are discussed between the PTL and the release manager, generally looking for consensus. In case no consensus can be reached on a feature freeze exception, the PTL has final say.

We use the RC1 milestone page to track the work that's left to do before we can issue the first release candidate. All known release blockers must be targeted to the RC milestone. Once that list is empty, we can publish the first release candidate (RC1). It is therefore important to keep that list current and reasonable. At this point we also create the release branch (for example proposed/juno for the Juno release), and the master branch is reopened for development (FeatureFreeze ends).

Special actions between RC1 and final release

The RC1 will be used as the release, unless a release-critical bug is found that warrants a release candidate respin. Release-critical bugs that may trigger a respin should be tagged series-rc-potential (for example juno-rc-potential), and are reviewed by the PTL and the release manager to see if they are worth a respin. As time passes, we get more picky about what should trigger a respin and what should be documented as a known issue. If a respin is warranted, we open a new milestone page to track the work to complete before the new RC can be published. It is recommended to only target bugs which already have a fix merged in master.

We use two different statuses for master and proposed/* merges, which allows tracking of RC bugs:

  • FixCommitted means "merged in master branch"
  • FixReleased means "merged in proposed/foo branch"


Changes proposed to proposed/* can be accepted by PTLs and the release manager. The policy for accepting those changes is to doublecheck that the fix is targeted to the milestone, and has landed in master first.

The process for backporting changes to proposed/* is described here.


Interacting with Launchpad

Teams

Each integrated project has a project page on launchpad:

  • https://launchpad.net/projectname
  • links to Code, Documentation and Community pages
  • references to bugs and blueprints
  • shows series, milestones, and links to corresponding release deliverables

Each project typically has multiple teams associated with it (the same person :

  • <projectname>-drivers (https://launchpad.net/~projectname-drivers)
    • folks responsible for maintaining the roadmap and objectives
    • can manage milestones, blueprints and blueprint settings
    • includes the PTL and anybody the PTL delegate this authority to
    • should include the Release managers team (~openstack-release) so that they can help in setting bug status
  • <projectname>-bugs (https://launchpad.net/~projectname-bugs)
    • can set importance and specific statuses to bugs
    • core devs from Gerrit and LP -drivers team are generally part of it
  • <projectname>-coresec (https://launchpad.net/~projectname-coresec)
    • will be added to private security bugs
    • core devs with interest and time for helping with security issues


There is also sometimes a generic ~projectname team (https://launchpad.net/~projectname) but it's not really used for anything anymore.

Bugs

https://bugs.launchpad.net/projectname

Receiving bug reports and specific, (ideally reproducible) problems from the community. Anyone can open a bug report against a project.

Bugs can be used to indicate small-sized feature additions or work tasks as well. Since bugs can be tagged (where blueprints can't), bugs can be a useful medium for triaging and working against lists of issues to achieve a specific goal.

A single bug in Launchpad can have multiple bug tasks, which can be project tasks or series tasks. Project tasks are used to track tasks necessary to fix the bug across several projects (so you can have a single bug affecting multiple OpenStack projects). Series tasks are also used to track backport work: you can nominate the bug for a given past series to track the completion of the backport of a bug to a stable/* branch. See here for an example.

Bugs are generally completely open. A special case of bug report is a security vulnerability. In general, these bugs are submitted as embargoed security bugs and only the reporter and the OpenStack VulnerabilityManagement team see these bugs initially. Access is controlled through bug "subscription". The project security team (coresec) of the affected project is quickly added to the access list, and additional folks can be subscribed from any of the people currently able to see the issue. As soon as possible, embargoed security issues are unembargoed and accessible by everyone.

Please learn the meaning of the different fields in a bug (status, importance...) at: Bugs

By default, bugs sort of importance, and then status - so setting the importance higher implies that they're more important to get solved.

Bugs (unlike blueprints) can be tagged with ad-hoc tags as well, and then those tags searched or filtered on. You can see official tags at: BugTags.

Another important field is the milestone associated with the bug. Bugs associated with a milestone mean that they're intended to be closed in that milestone. Later in a release cycle, a milestone "cut" will be blocked by open bugs associated with that milestone.

Actions

A PTL should make sure all new bugs are reviewed on a frequent basis - at least weekly:


Blueprints

https://blueprints.launchpad.net/projectname

We use blueprints to track incoming features and build a short-term roadmap. A blueprint may require one or more code commits to complete. Blueprints have a short description, link to spec, priority, delivery status, assignee, and can be targeted to a milestone. Anyone can propose a blueprint, but they should only appear in a milestone or a series plan if they are granted a priority and a target milestone by the PTL or one of the projects drivers.

Please learn the meaning of the different fields in a blueprint at: Blueprints

Actions

The milestone pages are used as a PTL communication tool, to reflect the PTL's current view on what's likely to land in the upcoming development milestones. A PTL should therefore strive to keep that view updated, by adding blueprints, setting priority and target milestones to correspond to the work being done. PTLs should also make sure that the implementation status is up to date, to accurately reflect progress.

Project-specific milestone plans are aggregated to build a single integrated release view at: [1]

As we get closer to the milestone delivery week, the PTL should review the blueprints and defer to the next milestone anything that is no longer likely to meet the milestone delivery date. Any such deferrals should be communicated as soon as possible.


Ask OpenStack

Ask OpenStack is the preferred way for community to ask for support. Anyone can open a question, and anyone can answer a question. Questions can be tagged by the project name, usually tagging is done by the person asking and/or by Ask moderators.

Answers can be linked to an existing bug report using the syntax lp:BUGNUMBER.

Actions

A PTL should make sure open questions get reviewed on a frequent basis - at least weekly: