Difference between revisions of "Network/Meetings"
(→On Demand Agenda) |
|||
Line 59: | Line 59: | ||
=== On Demand Agenda === | === On Demand Agenda === | ||
− | |||
− | |||
− | |||
* Liberty-RC1 | * Liberty-RC1 | ||
** https://launchpad.net/neutron/+milestone/liberty-rc1 | ** https://launchpad.net/neutron/+milestone/liberty-rc1 | ||
* Concrete plan to merge back pecan work | * Concrete plan to merge back pecan work | ||
** Need to do this very early after Liberty-2 is cut this week | ** Need to do this very early after Liberty-2 is cut this week | ||
− | * | + | * Mitaka Design Summit Sessions |
− | ** | + | ** Collecting ideas on the following etherpad |
+ | ** https://etherpad.openstack.org/p/neutron-mitaka-designsummit | ||
+ | * Need decision on how to handle test jobs for Neutron client | ||
+ | ** Email with details: http://lists.openstack.org/pipermail/openstack-dev/2015-August/072772.html | ||
* Vendor decomposition | * Vendor decomposition | ||
** Which vendors have not started final decomposition? | ** Which vendors have not started final decomposition? | ||
Line 74: | Line 74: | ||
** Does anything need to be left in the tree for packaging? | ** Does anything need to be left in the tree for packaging? | ||
*** Currently requirements.txt is left in the vendor dir with the name of the vendor package, but no one seems to know if it is needed. | *** Currently requirements.txt is left in the vendor dir with the name of the vendor package, but no one seems to know if it is needed. | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
* nova-network compatibility tasks | * nova-network compatibility tasks | ||
** Summit session(s) in Vancouver were very productive | ** Summit session(s) in Vancouver were very productive | ||
Line 92: | Line 82: | ||
*** "Get me a network (https://review.openstack.org/#/c/184857/) (kevinbenton to own this) | *** "Get me a network (https://review.openstack.org/#/c/184857/) (kevinbenton to own this) | ||
*** ARP Spoof patch series is stalled, need to make a decision on how to proceed. (kevinbenton will do this after beating requirements out of markmcclain) | *** ARP Spoof patch series is stalled, need to make a decision on how to proceed. (kevinbenton will do this after beating requirements out of markmcclain) | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
== Previous meeting logs == | == Previous meeting logs == |
Revision as of 13:50, 14 September 2015