Jump to: navigation, search

Difference between revisions of "Meetings/Tricircle"

(Agenda)
(Agenda)
 
(18 intermediate revisions by the same user not shown)
Line 8: Line 8:
 
===Latest===
 
===Latest===
  
===2016-4-29 Virtual Design Summit ===
+
===2016-11-16 Tricircle now is one of OpenStack Big-Tent project===
 +
http://lists.openstack.org/pipermail/openstack-dev/2016-November/107392.html
 +
 
 +
===2016-10-20 Tricircle 2.1.0 release(newton)===
 +
Tricircle is a project dedicated for networking automation across Neutron after splitting and cleaning
 +
https://pypi.python.org/pypi/tricircle/2.1.0
 +
 
 +
===2016-10-14 Tricircle 2.0.2 release(newton)===
 +
This is the last release for the Tricircle to include both OpenStack API gateway and networking automation functionalities
 +
https://pypi.python.org/pypi/tricircle/2.0.2
 +
 
 +
===2016-09-30 stable/newton branch created===
 +
http://lists.openstack.org/pipermail/openstack-dev/2016-September/104834.html
 +
 
 +
===2016-09-27 Tricircle session planning for Barcelonda design summit===
 +
http://lists.openstack.org/pipermail/openstack-dev/2016-September/104572.html
 +
https://etherpad.openstack.org/p/ocata-tricircle-sessions-planning
 +
 
 +
===2016-09-07 preparation for the Tricircle splitting===
 +
http://lists.openstack.org/pipermail/openstack-dev/2016-September/103077.html
 +
 
 +
===2016-09-01 How to address TCs concerns in Tricircle big-tent application===
 +
http://lists.openstack.org/pipermail/openstack-dev/2016-September/102668.html
 +
 
 +
===2016-4-29 Austin Virtual Design Summit ===
 
# https://etherpad.openstack.org/p/TricircleNeutonDesignSummit
 
# https://etherpad.openstack.org/p/TricircleNeutonDesignSummit
  
Line 45: Line 69:
 
= Meeting minutes and logs =
 
= Meeting minutes and logs =
 
all meeting logs and minutes could be found in <br />
 
all meeting logs and minutes could be found in <br />
 +
2017:  http://eavesdrop.openstack.org/meetings/tricircle/2017/<br />
 
2016:  http://eavesdrop.openstack.org/meetings/tricircle/2016/<br />
 
2016:  http://eavesdrop.openstack.org/meetings/tricircle/2016/<br />
 
2015:  http://eavesdrop.openstack.org/meetings/tricircle/2015/<br />
 
2015:  http://eavesdrop.openstack.org/meetings/tricircle/2015/<br />
  
 
= Agenda =
 
= Agenda =
 +
 +
===Weekly Team Meeting Feb.22, 2017===
 +
# Pike features development
 +
# Open Discussion
 +
 +
===Weekly Team Meeting Feb.8, 2017===
 +
# Ocata release dates
 +
# Pike meetup before PTG: https://etherpad.openstack.org/p/tricircle-pike-design-topics
 +
# Representative and topics to PTG
 +
# Open Discussion
 +
 +
===Weekly Team Meeting Jan.18, 2017===
 +
#  Ocata release preparation
 +
# Pike planning and design topics: https://etherpad.openstack.org/p/tricircle-pike-design-topics
 +
# QoS and LBaaS feature support
 +
# Open Discussion
 +
 +
===Weekly Team Meeting Jan.11, 2017===
 +
# Ocata release preparation
 +
# shadow_agent for VxLAN L2 networking/L3 DVR issue
 +
# shared_vlan confusion when creating vlan network in some specified region
 +
# Open Discussion
 +
 +
===Weekly Team Meeting Jan.4, 2017===
 +
# shadow_agent for VxLAN L2 networking/L3 DVR issue
 +
# db migration version
 +
# Open Discussion
 +
 +
===Weekly Team Meeting Dec.28, 2016===
 +
# shadow_agent for VxLAN L2 networking/L3 DVR issue
 +
# async. job reliability
 +
# db migration version
 +
# Ocata stable branch plan
 +
# Tricircle python client
 +
# Open Discussion
 +
 +
===Weekly Team Meeting Dec.21, 2016===
 +
# one idea to address VxLAN L2 networking/L3 DVR issue
 +
# Ocata feature development review
 +
# Open Discussion
 +
 +
===Weekly Team Meeting Dec.14, 2016===
 +
# VxLAN L2 networking across Neutron feature
 +
#  Ocata feature development review
 +
# Open Discussion
 +
 +
===Weekly Team Meeting Dec.7, 2016===
 +
# Bug smash and meetup summary
 +
# Ocata feature development review
 +
# legacy tables clean after splitting
 +
# Open Discussion
 +
 +
===Weekly Team Meeting Nov.30, 2016===
 +
Cancellation due to Bug-Smash
 +
 +
===Weekly Team Meeting Nov.23, 2016===
 +
# Ocata feature development review
 +
# Py35, Ubuntu Xenial gate and check jobs
 +
# Open Discussion
 +
 +
===Weekly Team Meeting Nov.16, 2016===
 +
# Ocata feature development discussion
 +
# Documentation requirement: http://docs.openstack.org/contributor-guide/quickstart/new-projects.html
 +
# Open Discussion
 +
 +
===Weekly Team Meeting Nov.9, 2016===
 +
# Tricircle big-tent application info share
 +
# Ocata feature development discussion
 +
 +
===Weekly Team Meeting Nov.2, 2016===
 +
# Tricircle design summit recap and Ocata planning
 +
https://etherpad.openstack.org/p/ocata-tricircle-work-session
 +
 +
===Weekly Team Meeting Oct.19, 2016===
 +
# Tricircle cleaning
 +
# bugs and blueprint cleaning
 +
# Ocata planning, mile stones.  OpenStack Ocata planning https://releases.openstack.org/ocata/schedule.html
 +
# Ocata cycle design summit sessions: [1][2]
 +
# open discussion
 +
[1]https://www.openstack.org/summit/barcelona-2016/summit-schedule/global-search?t=Tricircle%3A
 +
[2]https://wiki.openstack.org/wiki/Design_Summit/Ocata/Etherpads#Tricircle
 +
 +
===Weekly Team Meeting Oct.12, 2016===
 +
# Ocata cycle design summit sessions: [1][2]
 +
# Atlanta PTG(project team gather) presence
 +
# release for stable/newton and tricircle cleaning
 +
# open discussion
 +
[1]https://www.openstack.org/summit/barcelona-2016/summit-schedule/global-search?t=Tricircle%3A
 +
[2]https://wiki.openstack.org/wiki/Design_Summit/Ocata/Etherpads#Tricircle
 +
 +
===Weekly Team Meeting Sept.28, 2016===
 +
# Newton cycle design summit planning: https://etherpad.openstack.org/p/ocata-tricircle-sessions-planning
 +
# patch review before freeze date Sept.30
 +
# open discussion
 +
 +
===Weekly Team Meeting Sept.21, 2016===
 +
# freeze date for Newton release
 +
# patch planned to be merged before freeze date
 +
# open discussion
  
 
===Weekly Team Meeting Sept.14, 2016===
 
===Weekly Team Meeting Sept.14, 2016===
Line 76: Line 200:
  
 
===Weekly Team Meeting Aug.10, 2016===
 
===Weekly Team Meeting Aug.10, 2016===
# progress review in feature parity, dynamic pod binding:  
+
# progress review in feature parity, dynamic pod binding , cross pod L2 networking:  
 
https://docs.google.com/spreadsheets/d/1yXdxGtQq_6YJUtJtjmPICyhq4SbP8E6uWyzn0zev8bI/<https://docs.google.com/spreadsheets/d/1yXdxGtQq_6YJUtJtjmPICyhq4SbP8E6uWyzn0zev8bI/edit#gid=308439069>
 
https://docs.google.com/spreadsheets/d/1yXdxGtQq_6YJUtJtjmPICyhq4SbP8E6uWyzn0zev8bI/<https://docs.google.com/spreadsheets/d/1yXdxGtQq_6YJUtJtjmPICyhq4SbP8E6uWyzn0zev8bI/edit#gid=308439069>
, cross pod L2 networking,
 
 
# open discussion
 
# open discussion
  

Latest revision as of 09:15, 22 February 2017

Contents

Meetings

  • Weekly on Wednesdays at 1300 UTC
  • IRC channel: #openstack-meeting
  • Chair: joehuang (Chaoyi Huang)

Announcements

Latest

2016-11-16 Tricircle now is one of OpenStack Big-Tent project

http://lists.openstack.org/pipermail/openstack-dev/2016-November/107392.html

2016-10-20 Tricircle 2.1.0 release(newton)

Tricircle is a project dedicated for networking automation across Neutron after splitting and cleaning https://pypi.python.org/pypi/tricircle/2.1.0

2016-10-14 Tricircle 2.0.2 release(newton)

This is the last release for the Tricircle to include both OpenStack API gateway and networking automation functionalities https://pypi.python.org/pypi/tricircle/2.0.2

2016-09-30 stable/newton branch created

http://lists.openstack.org/pipermail/openstack-dev/2016-September/104834.html

2016-09-27 Tricircle session planning for Barcelonda design summit

http://lists.openstack.org/pipermail/openstack-dev/2016-September/104572.html https://etherpad.openstack.org/p/ocata-tricircle-sessions-planning

2016-09-07 preparation for the Tricircle splitting

http://lists.openstack.org/pipermail/openstack-dev/2016-September/103077.html

2016-09-01 How to address TCs concerns in Tricircle big-tent application

http://lists.openstack.org/pipermail/openstack-dev/2016-September/102668.html

2016-4-29 Austin Virtual Design Summit

  1. https://etherpad.openstack.org/p/TricircleNeutonDesignSummit

2016-4-8 Tricircle Dynamic Pod Binding discussion

https://etherpad.openstack.org/p/TricircleDynamicPodBinding

2016-4-1 Tricircle Cross Pod L2 Networking discussion

https://etherpad.openstack.org/p/TricircleCrossPodL2Networking

2016-1-14 Tricircle Stateless design moved to the master branch

2016-1-14 https://www.mail-archive.com/openstack-dev@lists.openstack.org/msg72841.html

2015-12-02 Tricircle Stateless design proposal

2015-12-02 https://www.mail-archive.com/openstack-dev@lists.openstack.org/msg69856.html

2015-10-29 Tricircle Mitaka Design Summit Etherpad in Tokyo

2015-10-29 https://wiki.openstack.org/wiki/Design_Summit/Mitaka/Etherpads#Tricircle

2015-08-17 Tricircle Liberty Midcycle Mini-sprint

The meeting will be held on Aug 17th, 2015 at #openstack-tricircle starting from UTC 1200
Please find the etherpad link in the open discussion section, and meeting agenda in the Agenda section

2015-06-24 Kickoff Announcements

Kickoff meeting: Wednesday, June 24th, 2015.

Open Discussion

Design Document

https://docs.google.com/document/d/18kZZ1snMOCD9IQvUKI5NVDzSASpw-QKj7l2zNqMEd3g/edit

Tricircle Mitaka Design Summit Etherpad

2015-10-29 https://wiki.openstack.org/wiki/Design_Summit/Mitaka/Etherpads#Tricircle

Tricircle Liberty Midcycle Mini-sprint Etherpad

https://etherpad.openstack.org/p/tricircle-liberty-midcycle-minisprint

Meeting minutes and logs

all meeting logs and minutes could be found in
2017: http://eavesdrop.openstack.org/meetings/tricircle/2017/
2016: http://eavesdrop.openstack.org/meetings/tricircle/2016/
2015: http://eavesdrop.openstack.org/meetings/tricircle/2015/

Agenda

Weekly Team Meeting Feb.22, 2017

  1. Pike features development
  2. Open Discussion

Weekly Team Meeting Feb.8, 2017

  1. Ocata release dates
  2. Pike meetup before PTG: https://etherpad.openstack.org/p/tricircle-pike-design-topics
  3. Representative and topics to PTG
  4. Open Discussion

Weekly Team Meeting Jan.18, 2017

  1. Ocata release preparation
  2. Pike planning and design topics: https://etherpad.openstack.org/p/tricircle-pike-design-topics
  3. QoS and LBaaS feature support
  4. Open Discussion

Weekly Team Meeting Jan.11, 2017

  1. Ocata release preparation
  2. shadow_agent for VxLAN L2 networking/L3 DVR issue
  3. shared_vlan confusion when creating vlan network in some specified region
  4. Open Discussion

Weekly Team Meeting Jan.4, 2017

  1. shadow_agent for VxLAN L2 networking/L3 DVR issue
  2. db migration version
  3. Open Discussion

Weekly Team Meeting Dec.28, 2016

  1. shadow_agent for VxLAN L2 networking/L3 DVR issue
  2. async. job reliability
  3. db migration version
  4. Ocata stable branch plan
  5. Tricircle python client
  6. Open Discussion

Weekly Team Meeting Dec.21, 2016

  1. one idea to address VxLAN L2 networking/L3 DVR issue
  2. Ocata feature development review
  3. Open Discussion

Weekly Team Meeting Dec.14, 2016

  1. VxLAN L2 networking across Neutron feature
  2. Ocata feature development review
  3. Open Discussion

Weekly Team Meeting Dec.7, 2016

  1. Bug smash and meetup summary
  2. Ocata feature development review
  3. legacy tables clean after splitting
  4. Open Discussion

Weekly Team Meeting Nov.30, 2016

Cancellation due to Bug-Smash

Weekly Team Meeting Nov.23, 2016

  1. Ocata feature development review
  2. Py35, Ubuntu Xenial gate and check jobs
  3. Open Discussion

Weekly Team Meeting Nov.16, 2016

  1. Ocata feature development discussion
  2. Documentation requirement: http://docs.openstack.org/contributor-guide/quickstart/new-projects.html
  3. Open Discussion

Weekly Team Meeting Nov.9, 2016

  1. Tricircle big-tent application info share
  2. Ocata feature development discussion

Weekly Team Meeting Nov.2, 2016

  1. Tricircle design summit recap and Ocata planning

https://etherpad.openstack.org/p/ocata-tricircle-work-session

Weekly Team Meeting Oct.19, 2016

  1. Tricircle cleaning
  2. bugs and blueprint cleaning
  3. Ocata planning, mile stones. OpenStack Ocata planning https://releases.openstack.org/ocata/schedule.html
  4. Ocata cycle design summit sessions: [1][2]
  5. open discussion

[1]https://www.openstack.org/summit/barcelona-2016/summit-schedule/global-search?t=Tricircle%3A [2]https://wiki.openstack.org/wiki/Design_Summit/Ocata/Etherpads#Tricircle

Weekly Team Meeting Oct.12, 2016

  1. Ocata cycle design summit sessions: [1][2]
  2. Atlanta PTG(project team gather) presence
  3. release for stable/newton and tricircle cleaning
  4. open discussion

[1]https://www.openstack.org/summit/barcelona-2016/summit-schedule/global-search?t=Tricircle%3A [2]https://wiki.openstack.org/wiki/Design_Summit/Ocata/Etherpads#Tricircle

Weekly Team Meeting Sept.28, 2016

  1. Newton cycle design summit planning: https://etherpad.openstack.org/p/ocata-tricircle-sessions-planning
  2. patch review before freeze date Sept.30
  3. open discussion

Weekly Team Meeting Sept.21, 2016

  1. freeze date for Newton release
  2. patch planned to be merged before freeze date
  3. open discussion

Weekly Team Meeting Sept.14, 2016

  1. PTL election
  2. progress review and concerns on the features like micro versions, policy control, dynamic pod binding, cross pod L2 networking
  3. Tricircle splitting: https://etherpad.openstack.org/p/TricircleSplitting
  4. open discussion

Weekly Team Meeting Sept.7, 2016

  1. progress review and concerns on the features like micro versions, policy control, dynamic pod binding, cross pod L2 networking
  2. preparation for the Tricircle splitting: https://etherpad.openstack.org/p/TricircleSplitting
  3. open discussion

Weekly Team Meeting Aug.31, 2016

  1. progress review and concerns on the features like micro versions, policy control, dynamic pod binding, cross pod L2 networking
  2. How to address TCs concerns in Tricircle big-tent application:https://docs.google.com/presentation/d/1kpVo5rsL6p_rq9TvkuczjommJSsisDiKJiurbhaQg7E
  3. open discussion

Weekly Team Meeting Aug.24, 2016

  1. progress review and concerns on the features like micro versions, policy control, dynamic pod binding, cross pod L2 networking
  2. How to address TCs concerns in Tricircle big-tent application
  3. open discussion

Weekly Team Meeting Aug.17, 2016

  1. progress review and concerns on the features like micro versions, policy control, dynamic pod binding, cross pod L2 networking
  2. open discussion

Weekly Team Meeting Aug.10, 2016

  1. progress review in feature parity, dynamic pod binding , cross pod L2 networking:

https://docs.google.com/spreadsheets/d/1yXdxGtQq_6YJUtJtjmPICyhq4SbP8E6uWyzn0zev8bI/<https://docs.google.com/spreadsheets/d/1yXdxGtQq_6YJUtJtjmPICyhq4SbP8E6uWyzn0zev8bI/edit#gid=308439069>

  1. open discussion

Weekly Team Meeting Aug.3, 2016

  1. progress review and concerns on the features like micro versions, policy control, dynamic pod binding, cross pod L2 networking
  2. open discussion

Weekly Team Meeting Jul.27, 2016

  1. microversion support
  2. Concerns from Tricircle big tent application: https://review.openstack.org/#/c/338796/

Weekly Team Meeting Jul.20, 2016

  1. microversion support
  2. Tricircle API feature paity planning: https://docs.google.com/spreadsheets/d/1yXdxGtQq_6YJUtJtjmPICyhq4SbP8E6uWyzn0zev8bI/edit#gid=308439069
  3. todo list review https://etherpad.openstack.org/p/TricircleToDo (API feature parity was just added, and microversion support's priority is prompted)

Weekly Team Meeting Jul.6, 2016

  1. bugs review: https://bugs.launchpad.net/tricircle
  2. bump to Nova 2.1: https://review.openstack.org/#/c/324226/
  3. L2/L3 networking with the help of 'Add Unicast Flooding Vteps to Provider Network': https://review.openstack.org/#/c/282180/
  4. todo list review https://etherpad.openstack.org/p/TricircleToDo

Weekly Team Meeting Jun.29, 2016

  1. progress of ‘cross pod L2 networking’ and ‘dynamic pod binding’
  2. todo list review
  3. integration test for new features

Weekly Team Meeting Jun.22, 2016

  • NO MEETING*

Weekly Team Meeting Jun.15, 2016

  1. spec review and status of ‘cross pod L2 networking’ and ‘dynamic pod binding’
  2. integration test in the ci pipeline
  3. policy enforcement for API access

Weekly Team Meeting Jun.8, 2016

  1. spec review and status of ‘cross pod L2 networking’ and ‘dynamic pod binding’
  2. policy enforcement for API access
  3. tempest test integration

Weekly Team Meeting Jun.1, 2016

  1. tempest plugin and test cases
  2. implementation discussion of ‘cross pod L2 networking’ and ‘dynamic pod binding’
  3. bugs review

Weekly Team Meeting May.25, 2016

  1. implementation discussion of ‘cross pod L2 networking’ and ‘dynamic pod binding’
  2. bugs review

Weekly Team Meeting May.18, 2016

  1. implementation discussion of ‘cross pod L2 networking’ and ‘dynamic pod binding’
  2. bugs review

Weekly Team Meeting May.11, 2016

  1. cross pod L2 networking, Local Network/Shared VLAN network
  2. dynamic pod binding
  3. features required for tempest

Weekly Team Meeting May.4, 2016

  1. PTL election of Newton release
  2. feature blocked tempest, server group
  3. L2GW integration for cross pod L2 networking
  4. dynamic pod binding

Virtual Design Summit Apr.29, 2016

  1. https://etherpad.openstack.org/p/TricircleNeutonDesignSummit

Weekly Team Meeting Apr.20, 2016

  1. object operation not implemented
  2. tempest test
  3. Reliable aync. Job – items left
  4. Link: https://etherpad.openstack.org/p/TricircleToDo

Weekly Team Meeting Apr.13, 2016

  1. Reliable aync. Job – items left
  2. tempest test
  3. basic VM/Volume operation
  4. Tricircle Mitaka Release
  5. Link: https://etherpad.openstack.org/p/TricircleToDo

Weekly Team Meeting Apr.6, 2016

  1. Cross OpenStack L2 networking
  2. pod scheduling
  3. Reliable aync. Job
  4. Link: https://etherpad.openstack.org/p/TricircleToDo

Weekly Team Meeting Mar. 30, 2016

  1. Cross OpenStack L2 networking
  2. pod scheduling
  3. Reliable aync. Job
  4. Link: https://etherpad.openstack.org/p/TricircleToDo

Weekly Team Meeting Mar. 23, 2016

  1. Mitaka release preparation
  2. Newton release features discussion

Weekly Team Meeting Mar. 16, 2016

  1. Progress review of To-do list: https://etherpad.openstack.org/p/TricircleToDo
  2. Mitaka release preparation

Weekly Team Meeting Mar. 10, 2016

  1. Progress of To-do list review: https://etherpad.openstack.org/p/TricircleToDo
  2. L2 networking across pods
  3. quota management

Weekly Team Meeting Mar. 2, 2016

  1. Progress of To-do list review: https://etherpad.openstack.org/p/TricircleToDo
  2. Reliable async. job
  3. L2 networking across pods
  4. quota management

Weekly Team Meeting Feb 24, 2016

  1. Progress of To-do list review: https://etherpad.openstack.org/p/TricircleToDo
  2. SEG
  3. Quota management
  4. Pod scheduling
  5. L2 networking across pods

Weekly Team Meeting Feb 17, 2016

  1. Progress of To-do list review: https://etherpad.openstack.org/p/TricircleToDo
  2. SEG
  3. Quota management
  4. exception logging, flavor mapping
  5. Pod scheduling
  6. L2 networking across pods

Weekly Team Meeting Feb 3rd, 2016

  1. Progress of To-do list review: https://etherpad.openstack.org/p/TricircleToDo
  2. Query optimization.
  3. Quota management.

Weekly Team Meeting Jan 27th, 2016

  1. Progress of To-do list review: https://etherpad.openstack.org/p/TricircleToDo
  2. l3 networking N-S.
  3. Quota management.

Weekly Team Meeting Jan 20th, 2016

  1. Progress of To-do list review: https://etherpad.openstack.org/p/TricircleToDo
  2. l3 networking N-S.
  3. Quota management.

Weekly Team Meeting Jan 13th, 2016

  1. Branch movement
  2. Progress of To-do list review: https://etherpad.openstack.org/p/TricircleToDo
  3. Discussion of phase 2 of stateless design.

Weekly Team Meeting Jan 6th, 2016

  1. Discussion of phase 2 of stateless design.
  2. Progress of To-do list: https://etherpad.openstack.org/p/TricircleToDo

Weekly Team Meeting Dec 23th, 2015

1. Progress of To-do list: https://etherpad.openstack.org/p/TricircleToDo
2. Discussion of stateless design.

Weekly Team Meeting Dec 9th, 2015

1. Progress of To-do list: https://etherpad.openstack.org/p/TricircleToDo
2. Discussion of stateless design.

Weekly Team Meeting Dec 2nd, 2015

1. Stateless PoC proposal: https://docs.google.com/document/d/18kZZ1snMOCD9IQvUKI5NVDzSASpw-QKj7l2zNqMEd3g/edit
2. networking design update: https://docs.google.com/document/d/18kZZ1snMOCD9IQvUKI5NVDzSASpw-QKj7l2zNqMEd3g/edit

Weekly Team Meeting Nov 25th, 2015

1. summary of Tokyo summit
2. design update: https://docs.google.com/document/d/18kZZ1snMOCD9IQvUKI5NVDzSASpw-QKj7l2zNqMEd3g/edit

Weekly Team Meeting Sept 2nd, 2015

1. recent progress
2. rest api
3. nova sketlon

Weekly Team Meeting Aug 26th, 2015

1. recent progress
2. az creation

Tricircle Liberty Midcycle Design Sprint Aug 17th, 2015

TBD

Weekly Team Meeting Aug 12th, 2015

1. local/bottom cascade service design
2. gampel to have a list of resources that need to be retrieved so we can check if it can be done by tenant context in the design work on resource mapping
3. RPC call from Neutron API to Cascade Service

Weekly Team Meeting Aug 5th, 2015

1. update the doc for how to work with KeyStone, joehuang
2. gampel check what mistral supports and which taskflow we want in the reference implementation
3. discuss pluggable cascade service module on bottom

Weekly Team Meeting July 29th, 2015

1. design BP and DAL patch opened by Zhiyuan
https://docs.google.com/document/d/19BXf0RhkH8wEEymE2eHHqoDZ67gnzgvpr3atk4qwdGs/edit#heading=h.5r6zgqbiehsh
https://review.openstack.org/#/c/205418/

Weekly Team Meeting July 22th, 2015

1. Discussion of design doc and source code at https://docs.google.com/document/d/19BXf0RhkH8wEEymE2eHHqoDZ67gnzgvpr3atk4qwdGs/edit#heading=h.5r6zgqbiehsh

2. DB design schema 3. Status caching 4. BP link to framework patch 5. CI pep8

Weekly Team Meeting July 15th, 2015

1. Discussion of design doc and source code at https://docs.google.com/document/d/19BXf0RhkH8wEEymE2eHHqoDZ67gnzgvpr3atk4qwdGs/edit#heading=h.5r6zgqbiehsh

2. the cascade service should be able run with multiple instances

Weekly Team Meeting July 8th, 2015

1. Discussion of design doc at https://docs.google.com/document/d/19BXf0RhkH8wEEymE2eHHqoDZ67gnzgvpr3atk4qwdGs/edit#heading=h.5r6zgqbiehsh

2. Work distribution.

Weekly Team Meeting July 1st, 2015

Discuss https://review.openstack.org/#/c/196564/

Kickoff meeting (June 24th, 2015):

1. Brief introduction of the project

2. Initial work goal setting for L release.

3. Project logistics discussion, such as Blueprint format, call for participants of initial team of core reviewers and so forth.

4. AoB

Logs and Minutes

all meeting logs and minutes could be found in http://eavesdrop.openstack.org/meetings/tricircle/2015/

2015-6-24, Kickoff meeting: http://eavesdrop.openstack.org/meetings/tricircle_weekly_meeting_2015_06_24/2015/tricircle_weekly_meeting_2015_06_24.2015-06-24-13.04.html

Meeting Commands

/join #openstack-meeting
#startmeeting tricircle
#topic rollcall
#topic Announcements
#undo

...

#endmeeting