Jump to: navigation, search

Difference between revisions of "Meetings/Kuryr"

Line 24: Line 24:
 
** https://review.openstack.org/#/c/269039/
 
** https://review.openstack.org/#/c/269039/
 
* Kubernetes Integration
 
* Kubernetes Integration
** https://blueprints.launchpad.net/kuryr/+spec/kuryr-k8s-integration
+
** https://review.openstack.org/#/c/281132/
** http://eavesdrop.openstack.org/meetings/kuryr/2016/kuryr.2016-01-26-15.03.log.html
+
** Using K8 Python client from Magnum
** https://etherpad.openstack.org/p/kuryr_k8s
+
** Syncing the binding part and the watcher part
** http://eavesdrop.openstack.org/irclogs/%23openstack-kuryr/%23openstack-kuryr.2016-02-03.log.html
+
** Older Links
 +
*** https://blueprints.launchpad.net/kuryr/+spec/kuryr-k8s-integration
 +
*** http://eavesdrop.openstack.org/meetings/kuryr/2016/kuryr.2016-01-26-15.03.log.html
 +
*** https://etherpad.openstack.org/p/kuryr_k8s
 +
*** http://eavesdrop.openstack.org/irclogs/%23openstack-kuryr/%23openstack-kuryr.2016-02-03.log.html
 
* Fullstack / Rally tests
 
* Fullstack / Rally tests
  

Revision as of 13:50, 18 February 2016

Important Links

Meeting Time

 Every two weeks (on odd weeks) on Tuesday at 0300 UTC in #openstack-meeting-4 (IRC) Starting: Nov. 17th, 2015
 Every two weeks (on even weeks) on Monday at 1500 UTC in #openstack-meeting-4 (IRC)

Meeting February 23, 2016

Agenda


Meeting February 15, 2016

Agenda

Meeting February 9, 2016

Agenda

Meeting February 1, 2016

Agenda

Meeting January 26, 2016

Agenda

Meeting January 11, 2016

Agenda


Meeting January 4, 2016

Agenda

Meeting December 22, 2015

Apologies for absence

  • banix, gsagie

Agenda

    • IPAM
    • Capabilities (apuimedo)
    • Testing
      • Tempest fullstack job merged
      • Rally integration job merged and should work - start adding plugins/scenarios
    • Docker Swarm
      • Works seamlessly; Will prepare a demo (banix)
    • Kubernetes Integration - etherpad
    • Kolla and Packaging
      • Working through the issue of Kolla requiring Docker 1.8
    • Magnum

Meeting December 15, 2015

Agenda

Meeting December 7 (December 8), 2015

Apologies for absence

  • banix can attend only the first 10-15 minutes


Agenda

  • Topics to Discuss
    • Capabilities
    • Testing
  • Open Discussion

Meeting November 30 (December 1), 2015

Agenda

  • Devstack
    • get devstack plugin merged and finished this week
    • apuimedo to make devstack nova inclusion configurable in the sample local.conf
  • IPAM
    • vikas tfukushima to work on the ipam as a spec or new bp
  • External Network Connectivity
    • vikas to move external connectivity to spec with the assumption of no default action

Meeting November 23, 2015

Agenda

  • Action Items (from last week meeting)
    • fawadkhaliq to check on plan for conntrack OVS support in Mitaka
    • banix to get the plug/unplug for OVS ready for review
    • All to review external connectivity blueprint #link
   https://blueprints.launchpad.net/kuryr/+spec/external-network-connectivity

Meeting November 17, 2015

Agenda

  • Announcements
  • Action Items (from last week meeting)
    • gsagie to check conntrack for security groups in the mitaka cycle
    • banix to work with diga on the ovs binding (with the hybrid as follow up patches if necessary)
    • apuimedo to review validation vikasc patches
    • apuimedo to review the external network connectivity blueprint


Meeting August 24, 2015

  • Action Items from last week meeting
    • diga to update on the executable calling via gerrit ;-). There are some reviews that need to be addressed.
    • tfukushima to find out about the label persistence or libnetwork abuse, i.e. Persistence of network creation labels to be able to use it for persisting the mapping of Docker networks to pre-existing Neutron networks.
    • gsagie to look at putting the network resource info in neutron as a last resort option
    • banix to update on configuration management for the next meeting
    • irenab gsagie to propose dates and format for the Sprint.
    • Go over the magnum-etherpad to review what changed since Thursday

Meeting August 17, 2015

Agenda

  • vif-binding-unbinding
  • libnetwork <-> docker network mapping
  • feature mapping
  • configuration management
  • sprint proposal
  • VM container networking

Meeting August 10, 2015

Agenda

Meeting August 3, 2015

Agenda

  • Review the project goals
  • Magnum / Kolla
  • Reviews

Previous Meeting Logs