Jump to: navigation, search

Difference between revisions of "Meetings/InfraTeamMeeting"

(Agenda for next meeting)
(Agenda for next meeting)
 
Line 1: Line 1:
  
 
<!-- ## page was renamed from Meetings/CITeamMeeting -->
 
<!-- ## page was renamed from Meetings/CITeamMeeting -->
{{:Header}}
 
 
 
= Weekly Project Infrastructure team meeting =
 
= Weekly Project Infrastructure team meeting =
  
The OpenStack Project Infrastructure Team holds public weekly meetings in <code><nowiki>#openstack-meeting</nowiki></code>, Tuesdays at 1900 UTC. Everyone interested in infrastructure and process surrounding automated testing and deployment is encouraged to attend.
+
The OpenDev Team holds public weekly meetings in <code><nowiki>#opendev-meeting</nowiki></code> on OFTC, Tuesdays at 1900 UTC. Everyone interested in infrastructure and process surrounding automated testing and deployment is encouraged to attend.
  
 
Please feel free to add agenda items (and your IRC nick in parenthesis).
 
Please feel free to add agenda items (and your IRC nick in parenthesis).
Line 12: Line 10:
  
 
* Announcements
 
* Announcements
 +
 
* Actions from last meeting
 
* Actions from last meeting
* Specs approval
+
 
** RefStack Site Hosting
+
* Specs Review
*** https://review.openstack.org/#/c/188207/ (hogepodge, davidlenwell)
+
 
** Centralize Release Tagging
+
* Topics
*** https://review.openstack.org/191193 (dhellmann)
+
** Upgrading Bionic servers to Focal/Jammy (clarkb 20230627)
* Schedule Project Renames
+
*** https://etherpad.opendev.org/p/opendev-bionic-server-upgrades
* Priority Efforts
+
*** https://review.opendev.org/q/topic:jitsi_meet-jammy-update
** Swift logs
+
*** Started looking at the wiki there are rough notes at: https://etherpad.opendev.org/p/opendev-bionic-server-upgrades#L58
** Nodepool DIB
+
** MariaDB Upgrades (clarkb 20240220)
** Migration to Zanata
+
*** Relying on the container image MARIADB_AUTO_UPGRADE flag
** Downstream Puppet
+
*** Etherpad and mailman are done. Gerrit and Gitea are all that remain.
*** (asselin available 2nd half of meeting)
+
** AFS Mirror cleanups (clarkb 20240220)
*** Common-ci Zuul merged: http://lists.openstack.org/pipermail/openstack-dev/2015-July/068565.html
+
*** Ubuntu Xenial is next but currently busy with PTG, Release, and other tasks.
*** Sign-up if interested in virtual sprint: July 8-9, 2015 15:00 UTC https://etherpad.openstack.org/p/common-ci-sprint
+
*** Can followup with webserver log processing to determine which other mirrors may be dead.
** Upgrading Gerrit
+
** Building Ubuntu Noble Nodes (clarkb 20240416)
** Docs publishing
+
*** https://review.opendev.org/c/opendev/glean/+/915907 Glean updates for python3.12 support
*** Holding pattern while Swift logs issues get ironed out
+
*** Appears we will need a debootstrap from debian unstable to build noble
* Phabricator analysis, following https://review.openstack.org/#/c/194119/ (ttx)
+
** Etherpad 2.0.x Upgrade planning (clarkb 20240416)
* Storyboard Development
+
*** https://review.opendev.org/c/opendev/system-config/+/914119
* Grafana.o.o (pabelanger)
+
*** Etherpad 2.0.2 removes the old APIKEY API auth method and now uses Oauth2.0 client_credentials instead. This new system is not yet released, but we are working to determine how to use it pre release.
** https://review.openstack.org/#/c/179208/
+
** Add reference to the project-team-guide in the fail ci msg (fungi 20240423)
* The Ops Mid-Cycle [http://lists.openstack.org/pipermail/openstack-operators/2015-July/007634.html details are now available], Palo Alto, Aug 18-19 (pleia2)
+
*** https://review.opendev.org/914189
** Since we'll be running an infra-cloud soon, it makes sense to send some infra people, so far the following people plan on attending: crinkle, greghaynes, pleia2
+
** Gerrit 3.9 Upgrade Planning (clarkb 20240423)
** Thoughts? Others interested/able?
+
*** https://www.gerritcodereview.com/3.9.html Release Notes
 +
*** Downgrade is possible with an offline reindex using the old war.
 +
*** Need to compile an upgrade checklist (go over breaking changes and also test the downgrade).
 +
*** Server could stand to be upgraded as well but I think it is probably best to decouple these concerns.
 +
** Wiki SSL Cert Renewal (clarkb 20240423)
 +
*** We have just under 4 weeks to renew the cert. This is one of the last (maybe the only) manually managed ssl cert.
 +
*** Will probably delay until we have less than a week left before processing it.
 +
 
 
* Open discussion
 
* Open discussion
  
 
== Upcoming Project Renames ==
 
== Upcoming Project Renames ==
(any additions should mention original->new full names and link to the corresponding change in Gerrit)
+
(any additions should mention original->new full names and link to the corresponding project-config rename change in Gerrit)
 +
Changes should have their topic set to project-rename.
  
* stackforge/puppet-murano -> openstack/puppet-murano, https://review.openstack.org/192730
+
* Rename example/foo -> example/bar: https://review.opendev.org/c/openstack/project-config/+/123456
* stackforge/cue -> openstack/cue, https://review.openstack.org/#/c/196268/
 
* openstack/python-keystoneclient-saml2 -> openstack/keystoneauth-saml2 (https://review.openstack.org/#/c/190631)
 
* stackforge/networking-vsphere -> openstack/networking-vsphere, https://review.openstack.org/#/c/196958/
 
* stackforge/networking-plumgrid -> openstack/networking-plumgrd https://review.openstack.org/#/c/197169/
 
* stackforge/{anchor,bandit} -> openstack/{anchor,bandit} https://review.openstack.org/197673
 
* stackforge/networking-arista -> openstack/networking-arista (https://review.openstack.org/#/c/195341)
 
* <strike>stackforge/{compass-adaptors,compass-core,compass-specs,compass-web} -> openstack/{compass-adaptors,compass-core,compass-specs,compass-web} https://review.openstack.org/196916</strike> [https://review.openstack.org/196973 The TC decided these are not ready yet.]
 
  
 
== Previous meetings ==
 
== Previous meetings ==
 
Previous meetings, with their notes and logs, can be found at http://eavesdrop.openstack.org/meetings/infra/ and earlier at http://eavesdrop.openstack.org/meetings/ci/
 
Previous meetings, with their notes and logs, can be found at http://eavesdrop.openstack.org/meetings/infra/ and earlier at http://eavesdrop.openstack.org/meetings/ci/

Latest revision as of 22:13, 22 April 2024

Weekly Project Infrastructure team meeting

The OpenDev Team holds public weekly meetings in #opendev-meeting on OFTC, Tuesdays at 1900 UTC. Everyone interested in infrastructure and process surrounding automated testing and deployment is encouraged to attend.

Please feel free to add agenda items (and your IRC nick in parenthesis).

Agenda for next meeting

  • Announcements
  • Actions from last meeting
  • Specs Review
  • Topics
    • Upgrading Bionic servers to Focal/Jammy (clarkb 20230627)
    • MariaDB Upgrades (clarkb 20240220)
      • Relying on the container image MARIADB_AUTO_UPGRADE flag
      • Etherpad and mailman are done. Gerrit and Gitea are all that remain.
    • AFS Mirror cleanups (clarkb 20240220)
      • Ubuntu Xenial is next but currently busy with PTG, Release, and other tasks.
      • Can followup with webserver log processing to determine which other mirrors may be dead.
    • Building Ubuntu Noble Nodes (clarkb 20240416)
    • Etherpad 2.0.x Upgrade planning (clarkb 20240416)
    • Add reference to the project-team-guide in the fail ci msg (fungi 20240423)
    • Gerrit 3.9 Upgrade Planning (clarkb 20240423)
      • https://www.gerritcodereview.com/3.9.html Release Notes
      • Downgrade is possible with an offline reindex using the old war.
      • Need to compile an upgrade checklist (go over breaking changes and also test the downgrade).
      • Server could stand to be upgraded as well but I think it is probably best to decouple these concerns.
    • Wiki SSL Cert Renewal (clarkb 20240423)
      • We have just under 4 weeks to renew the cert. This is one of the last (maybe the only) manually managed ssl cert.
      • Will probably delay until we have less than a week left before processing it.
  • Open discussion

Upcoming Project Renames

(any additions should mention original->new full names and link to the corresponding project-config rename change in Gerrit) Changes should have their topic set to project-rename.

Previous meetings

Previous meetings, with their notes and logs, can be found at http://eavesdrop.openstack.org/meetings/infra/ and earlier at http://eavesdrop.openstack.org/meetings/ci/