Jump to: navigation, search

Difference between revisions of "Meetings/InfraTeamMeeting"

(Agenda for next meeting)
(Agenda for next meeting)
 
(306 intermediate revisions by 13 users not shown)
Line 13: Line 13:
 
* Actions from last meeting
 
* Actions from last meeting
  
* Specs approval
+
* Specs Review
  
 
* Topics
 
* Topics
** Switch to OFTC now largely complete (clarkb 20210601)
+
** Upgrading Bionic servers to Focal/Jammy (clarkb 20230627)
*** https://review.opendev.org/q/topic:%22limnoria%22+status:open Limnoria bot rewrite
+
*** https://etherpad.opendev.org/p/opendev-bionic-server-upgrades
*** https://review.opendev.org/c/openstack/ptgbot/+/793792 Update PTGbot for OFTC
+
*** https://review.opendev.org/q/topic:jitsi_meet-jammy-update
*** Is PGTbot python3 capable? We also need to register a nick for it.
+
*** Started looking at the wiki there are rough notes at: https://etherpad.opendev.org/p/opendev-bionic-server-upgrades#L58
** Gerrit Account cleanup (clarkb 20210601)
+
** MariaDB Upgrades (clarkb 20240220)
*** Need review on more dangerous list. Can disable those accounts then clean them up if they look ok.
+
*** Relying on the container image MARIADB_AUTO_UPGRADE flag
** Picking up steam on Puppet -> Ansible rewrites (clarkb 20210601)
+
*** Etherpad and mailman are done. Gerrit and Gitea are all that remain.
*** Enable Xenial -> Bionic/Focal system upgrades
+
** AFS Mirror cleanups (clarkb 20240220)
*** https://etherpad.opendev.org/p/infra-puppet-conversions-and-xenial-upgrades Start capturing TODO list here
+
*** Ubuntu Xenial is next but currently busy with PTG, Release, and other tasks.
*** Mailman next
+
*** Can followup with webserver log processing to determine which other mirrors may be dead.
**** Will use semi recent snapshot as the test platform.
+
** Building Ubuntu Noble Nodes (clarkb 20240416)
** Cleaning up PPC packages in our CentOS 8 mirror (clarkb 20210608)
+
*** https://review.opendev.org/c/opendev/glean/+/915907 Glean updates for python3.12 support
** Scheduling project renames (clarkb 20210601)
+
*** Appears we will need a debootstrap from debian unstable to build noble
*** Our playbook(s) that do renames likely need updating since the last gerrit upgrade.
+
** Etherpad 2.0.x Upgrade planning (clarkb 20240416)
**** We can test this with our functional testing of gerrit too.
+
*** https://review.opendev.org/c/opendev/system-config/+/914119
 +
*** Etherpad 2.0.2 removes the old APIKEY API auth method and now uses Oauth2.0 client_credentials instead. This new system is not yet released, but we are working to determine how to use it pre release.
 +
** Add reference to the project-team-guide in the fail ci msg (fungi 20240423)
 +
*** https://review.opendev.org/914189
 +
** Gerrit 3.9 Upgrade Planning (clarkb 20240423)
 +
*** https://www.gerritcodereview.com/3.9.html Release Notes
 +
*** Downgrade is possible with an offline reindex using the old war.
 +
*** Need to compile an upgrade checklist (go over breaking changes and also test the downgrade).
 +
*** Server could stand to be upgraded as well but I think it is probably best to decouple these concerns.
 +
** Wiki SSL Cert Renewal (clarkb 20240423)
 +
*** We have just under 4 weeks to renew the cert. This is one of the last (maybe the only) manually managed ssl cert.
 +
*** Will probably delay until we have less than a week left before processing it.
  
 
* Open discussion
 
* Open discussion
Line 36: Line 47:
 
== Upcoming Project Renames ==
 
== Upcoming Project Renames ==
 
(any additions should mention original->new full names and link to the corresponding project-config rename change in Gerrit)
 
(any additions should mention original->new full names and link to the corresponding project-config rename change in Gerrit)
 +
Changes should have their topic set to project-rename.
  
* (lajoskatona) x/tap-as-a-service -> openstack/tap-as-a-service: https://review.opendev.org/c/openstack/project-config/+/790093
+
* Rename example/foo -> example/bar: https://review.opendev.org/c/openstack/project-config/+/123456
* foo/example -> bar/example: https://review.opendev.org/#/c/123456
 
  
 
== Previous meetings ==
 
== Previous meetings ==
 
Previous meetings, with their notes and logs, can be found at http://eavesdrop.openstack.org/meetings/infra/ and earlier at http://eavesdrop.openstack.org/meetings/ci/
 
Previous meetings, with their notes and logs, can be found at http://eavesdrop.openstack.org/meetings/infra/ and earlier at http://eavesdrop.openstack.org/meetings/ci/

Latest revision as of 22:13, 22 April 2024

Weekly Project Infrastructure team meeting

The OpenDev Team holds public weekly meetings in #opendev-meeting on OFTC, Tuesdays at 1900 UTC. Everyone interested in infrastructure and process surrounding automated testing and deployment is encouraged to attend.

Please feel free to add agenda items (and your IRC nick in parenthesis).

Agenda for next meeting

  • Announcements
  • Actions from last meeting
  • Specs Review
  • Topics
    • Upgrading Bionic servers to Focal/Jammy (clarkb 20230627)
    • MariaDB Upgrades (clarkb 20240220)
      • Relying on the container image MARIADB_AUTO_UPGRADE flag
      • Etherpad and mailman are done. Gerrit and Gitea are all that remain.
    • AFS Mirror cleanups (clarkb 20240220)
      • Ubuntu Xenial is next but currently busy with PTG, Release, and other tasks.
      • Can followup with webserver log processing to determine which other mirrors may be dead.
    • Building Ubuntu Noble Nodes (clarkb 20240416)
    • Etherpad 2.0.x Upgrade planning (clarkb 20240416)
    • Add reference to the project-team-guide in the fail ci msg (fungi 20240423)
    • Gerrit 3.9 Upgrade Planning (clarkb 20240423)
      • https://www.gerritcodereview.com/3.9.html Release Notes
      • Downgrade is possible with an offline reindex using the old war.
      • Need to compile an upgrade checklist (go over breaking changes and also test the downgrade).
      • Server could stand to be upgraded as well but I think it is probably best to decouple these concerns.
    • Wiki SSL Cert Renewal (clarkb 20240423)
      • We have just under 4 weeks to renew the cert. This is one of the last (maybe the only) manually managed ssl cert.
      • Will probably delay until we have less than a week left before processing it.
  • Open discussion

Upcoming Project Renames

(any additions should mention original->new full names and link to the corresponding project-config rename change in Gerrit) Changes should have their topic set to project-rename.

Previous meetings

Previous meetings, with their notes and logs, can be found at http://eavesdrop.openstack.org/meetings/infra/ and earlier at http://eavesdrop.openstack.org/meetings/ci/