Jump to: navigation, search

Difference between revisions of "Meetings/InfraTeamMeeting"

(Agenda for next meeting)
(Agenda for next meeting)
Line 22: Line 22:
 
*** Zuul as CD engine
 
*** Zuul as CD engine
 
** OpenDev
 
** OpenDev
*** Preparing to upgrade Gerrit from 2.13 to 3.2
+
*** Post Gerrit Upgrade Updates
**** review-test is back up an running. Now with November 5th state.
+
**** Configuration tuning
**** We announced the upgrade is happening November 20 - 22
+
***** Cache sizes
**** jeepyb bug update and the welcome message hooks rely on database access and will need to be updated or sunsetted
+
***** Autogc
**** Upgrade Notes
+
**** Zuul results table rendering
***** Gave more threads to notedb conversion and it went quicker. Not fast but was an improvement.
+
**** Switch to Java 11
***** Need to land the non WIP changes at https://review.opendev.org/#/q/status:open+topic:gerrit-upgrade-prep
+
***** Any concern about java version specific things in lucene or h2 caches?
***** The first WIP change in https://review.opendev.org/#/q/status:open+topic:gerrit-upgrade-prep is a number of squashed changes to simplify post upgrade config management sync up.
+
***** Shoudl definitely test this on review-test
***** https://etherpad.opendev.org/p/opendev-gerrit-3.2-upgrade-plan the plan is here. A few items still need a little work. Please take a look.
 
**** Unknowns
 
***** Storyboard integration
 
  
 
* General topics
 
* General topics
** Bup and Borg Backups (clarkb 20201117)
+
** Bup and Borg Backups (clarkb 20201201)
** PTG followups (clarkb 20201117)
+
** Docker rate limiting is being seen (at least in limestone) (clarkb 20201201)
** meetpad was not useable for (some?) participants from China (frickler 20201110)
+
** PTG followups (clarkb 20201201)
 +
** meetpad was not useable for (some?) participants from China (frickler 20201201)
 
*** clarkb trying to set up time with Horace to test a meetpad call with a participant in China.
 
*** clarkb trying to set up time with Horace to test a meetpad call with a participant in China.
** Long term plans for running openstackid.org (clarkb 20201110)
+
** Splitting puppet else into specific infra-prod jobs (clarkb 20201201)
** Splitting puppet else into specific infra-prod jobs (clarkb 20201110)
 
 
*** Should be mostly mechanical
 
*** Should be mostly mechanical
 
*** Does it make sense to try and sprint this? Have several people work on getting it done in a short period of time?
 
*** Does it make sense to try and sprint this? Have several people work on getting it done in a short period of time?

Revision as of 21:47, 30 November 2020

Weekly Project Infrastructure team meeting

The OpenDev Team holds public weekly meetings in #opendev-meeting, Tuesdays at 1900 UTC. Everyone interested in infrastructure and process surrounding automated testing and deployment is encouraged to attend.

Please feel free to add agenda items (and your IRC nick in parenthesis).

Agenda for next meeting

  • Actions from last meeting
  • Specs approval
  • Priority Efforts (Standing meeting agenda items. Please expand if you have subtopics.)
    • Update Config Management
      • topic:update-cfg-mgmt
      • Zuul as CD engine
    • OpenDev
      • Post Gerrit Upgrade Updates
        • Configuration tuning
          • Cache sizes
          • Autogc
        • Zuul results table rendering
        • Switch to Java 11
          • Any concern about java version specific things in lucene or h2 caches?
          • Shoudl definitely test this on review-test
  • General topics
    • Bup and Borg Backups (clarkb 20201201)
    • Docker rate limiting is being seen (at least in limestone) (clarkb 20201201)
    • PTG followups (clarkb 20201201)
    • meetpad was not useable for (some?) participants from China (frickler 20201201)
      • clarkb trying to set up time with Horace to test a meetpad call with a participant in China.
    • Splitting puppet else into specific infra-prod jobs (clarkb 20201201)
      • Should be mostly mechanical
      • Does it make sense to try and sprint this? Have several people work on getting it done in a short period of time?
    • Trusty Upgrade Progress (clarkb 20200929)
      • Wiki updates
  • Open discussion

Upcoming Project Renames

(any additions should mention original->new full names and link to the corresponding project-config rename change in Gerrit)

Previous meetings

Previous meetings, with their notes and logs, can be found at http://eavesdrop.openstack.org/meetings/infra/ and earlier at http://eavesdrop.openstack.org/meetings/ci/