Jump to: navigation, search

Difference between revisions of "Meetings/InfraTeamMeeting"

(Agenda for next meeting)
(Agenda for next meeting)
Line 1: Line 1:
  
 
<!-- ## page was renamed from Meetings/CITeamMeeting -->
 
<!-- ## page was renamed from Meetings/CITeamMeeting -->
{{:Header}}
+
= Weekly Project Infrastructure team meeting =
  
= Weekly Project Infrastructure team meeting =
+
The OpenDev Team holds public weekly meetings in <code><nowiki>#opendev-meeting</nowiki></code>, Tuesdays at 1900 UTC. Everyone interested in infrastructure and process surrounding automated testing and deployment is encouraged to attend.
  
The OpenStack Project Infrastructure Team holds public weekly meetings in <code><nowiki>#openstack-meeting</nowiki></code>, Tuesdays at 1900 UTC. Everyone interested in infrastructure and process surrounding automated testing and deployment is encouraged to attend.
+
Please feel free to add agenda items (and your IRC nick in parenthesis).
  
 
== Agenda for next meeting ==
 
== Agenda for next meeting ==
 +
 +
* Announcements
 +
** OpenStack Release October 14
 +
** Summit next week. PTG the week after.
  
 
* Actions from last meeting
 
* Actions from last meeting
* Jenkins slave operating systems
+
 
* Grenade
+
* Specs approval
* Gearman
+
 
* Pypi mirror / requirements
+
* Priority Efforts (Standing meeting agenda items. Please expand if you have subtopics.)
* baremetal testing
+
** [http://specs.openstack.org/openstack-infra/infra-specs/specs/update-config-management.html Update Config Management]
* releasing git-review
+
*** topic:update-cfg-mgmt
 +
*** Zuul as CD engine
 +
** OpenDev
 +
*** Preparing to upgrade Gerrit from 2.13 to 3.2
 +
**** review-test.opendev.org is an upgraded snapshot of production from October 1. Please check it out
 +
**** Basic functionality seems to be working
 +
***** logging in, git review -s, git review to push, commenting on changes, ICLA signing, replication, change searching, and so on.
 +
**** jeepyb bug/spec update hooks and the welcome message hook rely on database access and will need to be updated or sunsetted
 +
**** Upgrade Process
 +
***** Backup then upgrade from 2.13 to 2.16. This is our fallback midpoint checkpoint
 +
***** Backup again then migrate to notedb on 2.16
 +
***** Upgrade to 3.2
 +
***** Upgrade to 2.16 along with backups should be doable in a day. Then notedb migration can happen overnight with 3.2 upgrade happening on day two.
 +
**** Unknowns
 +
***** Storyboard integration
 +
**** Can we start talking about scheduling the outage and upgrade?
 +
*** Luca has offered to do a conference call with us. Let me know if interested and I'll include you for scheduling if/when that happens.
 +
 
 +
* General topics
 +
** PTG PLanning (clarkb 20200929)
 +
*** October PTG registration is now open: https://www.openstack.org/ptg/
 +
*** OpenDev planning stats here: https://etherpad.opendev.org/opendev-ptg-planning-oct-2020
 +
** Bup and Borg Backups (clarkb 20200929)
 +
*** Ethercalc to be the first borg backed up service
 +
** Splitting puppet else into specific infra-prod jobs (clarkb 20200929)
 +
*** Should be mostly mechanical
 +
*** Does it make sense to try and sprint this? Have several people work on getting it done in a short period of time?
 +
** Trusty Upgrade Progress (clarkb 20200929)
 +
*** Wiki updates
 +
 
 
* Open discussion
 
* Open discussion
 +
 +
== Upcoming Project Renames ==
 +
(any additions should mention original->new full names and link to the corresponding project-config rename change in Gerrit)
 +
 +
* foo/example -> bar/example: https://review.opendev.org/#/c/123456
  
 
== Previous meetings ==
 
== Previous meetings ==
 
Previous meetings, with their notes and logs, can be found at http://eavesdrop.openstack.org/meetings/infra/ and earlier at http://eavesdrop.openstack.org/meetings/ci/
 
Previous meetings, with their notes and logs, can be found at http://eavesdrop.openstack.org/meetings/infra/ and earlier at http://eavesdrop.openstack.org/meetings/ci/

Revision as of 20:59, 12 October 2020

Weekly Project Infrastructure team meeting

The OpenDev Team holds public weekly meetings in #opendev-meeting, Tuesdays at 1900 UTC. Everyone interested in infrastructure and process surrounding automated testing and deployment is encouraged to attend.

Please feel free to add agenda items (and your IRC nick in parenthesis).

Agenda for next meeting

  • Announcements
    • OpenStack Release October 14
    • Summit next week. PTG the week after.
  • Actions from last meeting
  • Specs approval
  • Priority Efforts (Standing meeting agenda items. Please expand if you have subtopics.)
    • Update Config Management
      • topic:update-cfg-mgmt
      • Zuul as CD engine
    • OpenDev
      • Preparing to upgrade Gerrit from 2.13 to 3.2
        • review-test.opendev.org is an upgraded snapshot of production from October 1. Please check it out
        • Basic functionality seems to be working
          • logging in, git review -s, git review to push, commenting on changes, ICLA signing, replication, change searching, and so on.
        • jeepyb bug/spec update hooks and the welcome message hook rely on database access and will need to be updated or sunsetted
        • Upgrade Process
          • Backup then upgrade from 2.13 to 2.16. This is our fallback midpoint checkpoint
          • Backup again then migrate to notedb on 2.16
          • Upgrade to 3.2
          • Upgrade to 2.16 along with backups should be doable in a day. Then notedb migration can happen overnight with 3.2 upgrade happening on day two.
        • Unknowns
          • Storyboard integration
        • Can we start talking about scheduling the outage and upgrade?
      • Luca has offered to do a conference call with us. Let me know if interested and I'll include you for scheduling if/when that happens.
  • General topics
    • PTG PLanning (clarkb 20200929)
    • Bup and Borg Backups (clarkb 20200929)
      • Ethercalc to be the first borg backed up service
    • Splitting puppet else into specific infra-prod jobs (clarkb 20200929)
      • Should be mostly mechanical
      • Does it make sense to try and sprint this? Have several people work on getting it done in a short period of time?
    • Trusty Upgrade Progress (clarkb 20200929)
      • Wiki updates
  • Open discussion

Upcoming Project Renames

(any additions should mention original->new full names and link to the corresponding project-config rename change in Gerrit)

Previous meetings

Previous meetings, with their notes and logs, can be found at http://eavesdrop.openstack.org/meetings/infra/ and earlier at http://eavesdrop.openstack.org/meetings/ci/