Difference between revisions of "Meetings/InfraTeamMeeting"
< Meetings
Clark Boylan (talk | contribs) (→Agenda for next meeting) |
Clark Boylan (talk | contribs) (→Agenda for next meeting) |
||
Line 30: | Line 30: | ||
***** Backup again then migrate to notedb on 2.16 | ***** Backup again then migrate to notedb on 2.16 | ||
***** Upgrade to 3.2 | ***** Upgrade to 3.2 | ||
+ | ***** Upgrade to 2.16 along with backups should be doable in a day. Then notedb migration can happen overnight with 3.2 upgrade happening on day two. | ||
**** Unknowns | **** Unknowns | ||
***** Storyboard integration | ***** Storyboard integration | ||
Line 38: | Line 39: | ||
*** October PTG registration is now open: https://www.openstack.org/ptg/ | *** October PTG registration is now open: https://www.openstack.org/ptg/ | ||
*** OpenDev planning stats here: https://etherpad.opendev.org/opendev-ptg-planning-oct-2020 | *** OpenDev planning stats here: https://etherpad.opendev.org/opendev-ptg-planning-oct-2020 | ||
− | |||
− | |||
− | |||
− | |||
− | |||
** Splitting puppet else into specific infra-prod jobs (clarkb 20200929) | ** Splitting puppet else into specific infra-prod jobs (clarkb 20200929) | ||
*** Should be mostly mechanical | *** Should be mostly mechanical |
Revision as of 20:50, 12 October 2020
Contents
Weekly Project Infrastructure team meeting
The OpenDev Team holds public weekly meetings in #opendev-meeting
, Tuesdays at 1900 UTC. Everyone interested in infrastructure and process surrounding automated testing and deployment is encouraged to attend.
Please feel free to add agenda items (and your IRC nick in parenthesis).
Agenda for next meeting
- Announcements
- OpenStack Release October 14
- Actions from last meeting
- Specs approval
- Priority Efforts (Standing meeting agenda items. Please expand if you have subtopics.)
- Update Config Management
- topic:update-cfg-mgmt
- Zuul as CD engine
- OpenDev
- Preparing to upgrade Gerrit from 2.13 to 3.2
- review-test.opendev.org is an upgraded snapshot of production from October 1. Please check it out
- Basic functionality seems to be working
- logging in, git review -s, git review to push, commenting on changes, ICLA signing, replication, change searching, and so on.
- jeepyb bug/spec update hooks and the welcome message hook rely on database access and will need to be updated or sunsetted
- Upgrade Process
- Backup then upgrade from 2.13 to 2.16. This is our fallback midpoint checkpoint
- Backup again then migrate to notedb on 2.16
- Upgrade to 3.2
- Upgrade to 2.16 along with backups should be doable in a day. Then notedb migration can happen overnight with 3.2 upgrade happening on day two.
- Unknowns
- Storyboard integration
- Luca has offered to do a conference call with us. Let me know if interested and I'll include you for scheduling if/when that happens.
- Preparing to upgrade Gerrit from 2.13 to 3.2
- Update Config Management
- General topics
- PTG PLanning (clarkb 20200929)
- October PTG registration is now open: https://www.openstack.org/ptg/
- OpenDev planning stats here: https://etherpad.opendev.org/opendev-ptg-planning-oct-2020
- Splitting puppet else into specific infra-prod jobs (clarkb 20200929)
- Should be mostly mechanical
- Does it make sense to try and sprint this? Have several people work on getting it done in a short period of time?
- Bup and Borg Backups (clarkb 20200929)
- https://review.opendev.org/741366 is ready to land when we are ready.
- Trusty Upgrade Progress (clarkb 20200929)
- Wiki updates
- PTG PLanning (clarkb 20200929)
- Open discussion
Upcoming Project Renames
(any additions should mention original->new full names and link to the corresponding project-config rename change in Gerrit)
- foo/example -> bar/example: https://review.opendev.org/#/c/123456
Previous meetings
Previous meetings, with their notes and logs, can be found at http://eavesdrop.openstack.org/meetings/infra/ and earlier at http://eavesdrop.openstack.org/meetings/ci/