Difference between revisions of "Governance/Foundation"
(fixing typo) |
(updated tentative schedule and added link to structure proposal) |
||
Line 6: | Line 6: | ||
== Documents == | == Documents == | ||
− | [[Governance/Foundation/Mission|Foundation Mission]] | + | * [[Governance/Foundation/Mission|Foundation Mission]] |
+ | * [[Governance/Foundation/Structure|Foundation Structure]] | ||
== Tentative schedule == | == Tentative schedule == | ||
Line 18: | Line 19: | ||
* Discussion of Structure Draft: February | * Discussion of Structure Draft: February | ||
** Mailing List Discussion | ** Mailing List Discussion | ||
+ | ** In person meetup in Sunnyvale, February 15 at 4:30 PM | ||
** Webinar to gather additional feedback (details to be posted on mailing list, blog, and twitter) | ** Webinar to gather additional feedback (details to be posted on mailing list, blog, and twitter) | ||
− | ** | + | * Finalize initial Strategic Members and Drafting Committee: March |
+ | * Drafting committee publishes drafts and revisions: April & May | ||
+ | * Publish final structure: June | ||
+ | * Membership targets met to ratify documents: X 2012 | ||
+ | * Operations of Foundation begin after 60-day transition period: X 2012 + 60 days |
Revision as of 21:45, 10 February 2012
OpenStack Foundation
In 2011, Rackspace announced that it would be transitioning management of OpenStack to an independent foundation structure. This section contains draft documents related to the formation of the foundation.
Documents
Tentative schedule
- Post Draft of Foundation Mission to wiki: Jan 5th, 2012
- Discussion of Foundation Mission Draft: Jan 5th-Jan 22nd
- Mailing list discussion
- Webinar to gather additional feedback (details to be posted on mailing list, blog, and twitter)
- Post Revised Foundation Mission: Week of
January 23rdJanuary 30th - Post Draft of Structure: Week of
January 30thFebruary 6th - Discussion of Structure Draft: February
- Mailing List Discussion
- In person meetup in Sunnyvale, February 15 at 4:30 PM
- Webinar to gather additional feedback (details to be posted on mailing list, blog, and twitter)
- Finalize initial Strategic Members and Drafting Committee: March
- Drafting committee publishes drafts and revisions: April & May
- Publish final structure: June
- Membership targets met to ratify documents: X 2012
- Operations of Foundation begin after 60-day transition period: X 2012 + 60 days