Jump to: navigation, search

Difference between revisions of "Gluon/PoC-Ocata-Summit"

(Created page with "=== Proof-of-Concept (PoC) in Ocata Design Summit, October 24-28, 2016, Barcelona === The scope of a Gluon PoC includes: * Interaction model with Neutron and Nova via Neutron...")
 
Line 12: Line 12:
 
# Story (Niko): [http://jira.opnfv.org/browse/NETREADY-26 Database Migration from SQLLite to MySQL]
 
# Story (Niko): [http://jira.opnfv.org/browse/NETREADY-26 Database Migration from SQLLite to MySQL]
 
## Task (Niko): [http://jira.opnfv.org/browse/NETREADY-27 Implementation Proposal of MySQL for Database Migration] (Completed)
 
## Task (Niko): [http://jira.opnfv.org/browse/NETREADY-27 Implementation Proposal of MySQL for Database Migration] (Completed)
# Story (Jin Li): [http://jira.opnfv.org/browse/NETREADY-28 PoC Testing]
+
# Story (Jin Li): [http://jira.opnfv.org/browse/NETREADY-28 PoC Testing] (completed)
 
## Task (Jin Li): [http://jira.opnfv.org/browse/NETREADY-29 Initial testing proposal] (Completed)
 
## Task (Jin Li): [http://jira.opnfv.org/browse/NETREADY-29 Initial testing proposal] (Completed)
 
# Story (Georg): [http://jira.opnfv.org/browse/NETREADY-39 Design document for port and service binding model in Gluon]
 
# Story (Georg): [http://jira.opnfv.org/browse/NETREADY-39 Design document for port and service binding model in Gluon]
 
# Task (Ian): [http://jira.opnfv.org/browse/NETREADY-40 Devstack installer integration]
 
# Task (Ian): [http://jira.opnfv.org/browse/NETREADY-40 Devstack installer integration]

Revision as of 15:12, 29 November 2016

Proof-of-Concept (PoC) in Ocata Design Summit, October 24-28, 2016, Barcelona

The scope of a Gluon PoC includes:

  • Interaction model with Neutron and Nova via Neutron Plugin for Gluon
  • New Protons, i.e. new service APIs, via new YAML

Progress of PoC is tracked by JIRA Ticket (Epic) in OPNFV:

  1. Task (Ian): Push code from Github to OpenStack Gluon repo (Completed)
  2. Story (Tom): Gluon Neutron ML2 Plugin (Completed)
    1. Task (Tom): Initial proposal describing ML2 approach (Completed)
    2. Task (Tom): Push Interim Gluon Neutron ML2 Plugin Code for Gerrit Review (Completed)
  3. Story (Niko): Database Migration from SQLLite to MySQL
    1. Task (Niko): Implementation Proposal of MySQL for Database Migration (Completed)
  4. Story (Jin Li): PoC Testing (completed)
    1. Task (Jin Li): Initial testing proposal (Completed)
  5. Story (Georg): Design document for port and service binding model in Gluon
  6. Task (Ian): Devstack installer integration