Difference between revisions of "Foundation/ProfessionalCertification/Meeting1"
(Created page with "OpenStack Foundation Job Task Analysis – Meeting 1 Minutes Project: OpenStack Foundation (OSF) Job Task Analysis for: Certified OpenStack Administrator (COA) Date/Time: W...") |
|||
Line 6: | Line 6: | ||
Date/Time: Wednesday, June 17, 2014, 20:00 UTC to 22:00 UTC (3:00 pm to 5:00 pm CDT) | Date/Time: Wednesday, June 17, 2014, 20:00 UTC to 22:00 UTC (3:00 pm to 5:00 pm CDT) | ||
− | |||
− | |||
Start time: 20:02 UTC (3:02 pm CDT) | Start time: 20:02 UTC (3:02 pm CDT) |
Latest revision as of 22:25, 27 July 2015
OpenStack Foundation
Job Task Analysis – Meeting 1 Minutes
Project: OpenStack Foundation (OSF) Job Task Analysis for: Certified OpenStack Administrator (COA)
Date/Time: Wednesday, June 17, 2014, 20:00 UTC to 22:00 UTC (3:00 pm to 5:00 pm CDT)
Start time: 20:02 UTC (3:02 pm CDT)
Adjourn time: 22:00 UTC (5:00 pm CDT)
2.0 COMMITTEE MEMBERSHIP
Borut Rismal, Slovenia
Pranav Salunke, Germany
Steve Nettles, Program Director, Psychometrics Division, Applied Measurement Professionals, Inc.
James Hellrung, MA Research Associate, Applied Measurement Professionals, Inc. (AMP)
Heidi Bretz: Director Business Development, OpenStack Foundation, USA
Clyde Seepersad, GM Training and Certification Linux Foundation, USA
Liz Kline, Project Manager, USA
page 1
OpenStack Foundation
Job Task Analysis Agenda – Meeting 1
Wednesday, June 17, 2014, 20:00UTCto 22:00 UTC (3:00 pm to 5:00 pm CDT)
GoToMeeting: https://global.gotomeeting.com/join/771331709
II. Overview of the Job Task Analysis (JTA) Process
A. Compile background information
D. Review survey results
E. Develop test specifications
III. Practitioner Definition (Scope)
A. Define target practitioners
A. Review draft task list
OpenStack Foundation
Job Task Analysis – Meeting 1 Minutes
page 2
B. Delete/modify task statements
C. Add new task statements
D. Develop domain headings
V. Survey Demographic Information
A. Determine survey respondent variables
B. Discuss subgroup analyses
A. Discuss survey delivery and target practitioners
A. Conduct first set of meetings to develop TKSA list
B. Send final draft survey to Committee for review
C. Conduct pilot test of survey
D. Send email invitations to practitioners
E. Analyze survey results
F. Conduct second set of meetings to develop test specifications
1) Review survey results
2) Develop test specifications
Next meeting: Wednesday, June 24, 2015, UTC to 22:00 UTC (3:00 pm to 5:00 pm CDT)
The web meeting started at 3:02 PM CDT via GoToMeeting. Introductory comments were made by Heidi
Bretz, OpenStack Foundation, welcoming the committee and introducing the project. Steve Nettles, AMP
then provided background information on the JTA process in which the rationale and goals of the JTA were
All documents were shared using GoToMeeting. Steve Nettles and James Hellrung, AMP facilitated the rest
of the meeting proceedings. The committee first discussed the definition of the target practitioners. After
several minutes of discussion, they decided that it would be best to review the draft list of activities and
domains, and revisit developing the definitions after their review of the draft list. There was verbal interaction
by the committee as well as “back channel” IM commentary via GoToMeeting. The committee developed the
initial list of major domains, and decided on a draft list to be used for the next phase of the project.
It was decided that the draft list of activities would be published to Google Drive and the committee would
review it prior to next week’s meeting. Specifically, the committee was tasked to review the complete list of
tasks, assigning each to one area of the revised list of major domains. AMP will revise the spreadsheet of
activities/KSAs for the committee's input for publishing to Google Drive. Audio, screenshared video, and the
chat log were recorded and can be viewed on Google Drive in this folder: 06 17 2015 Meeting 1. The
meeting adjourned at 5 PM CDT.
Review tasks individually before next meeting.
7.0 POST MEETING ACTION ITEMS
OpenStack Foundation
Job Task Analysis – Meeting 1 Minutes
page 3
Each committee member will review and revise the preliminary task list by by 1:00 pm UTC (8:00 am CDT)
Tuesday, June 23. James Hellrung at AMP will then compile the data and present it for full committee in the
call on Wednesday, June 24. Links and instructions to be sent in a separate email.
All JTAC meetings will be held from 20:00UTC to 22:00 UTC(3:00 pm to 5:00 pm CDT). Attendance at
Wednesday, June 24, 2015
Wednesday, July 1, 2015
Wednesday, July 8, 2015
Wednesday, September 2, 2015
Wednesday, September 9, 2015
Wednesday, September 16, 2015
Wednesday, September 23, 2015
Wednesday, October 21, 2015 (not facilitated by AMP)