Jump to: navigation, search

Difference between revisions of "Design Summit/Havana/Etherpads"

(Process / Infra)
Line 163: Line 163:
 
* [https://etherpad.openstack.org/havana-test-runners-wrappers Sorting out test runners, wrappers and venvs B119]
 
* [https://etherpad.openstack.org/havana-test-runners-wrappers Sorting out test runners, wrappers and venvs B119]
 
* [https://etherpad.openstack.org/havana-failure-management-in-the-gate Failure management in the gate]
 
* [https://etherpad.openstack.org/havana-failure-management-in-the-gate Failure management in the gate]
* Bare Metal Testing
+
* [https://etherpad.openstack.org/havana-bare-metal-testing Bare Metal Testing]
 
* [https://etherpad.openstack.org/havana-ci-logging OpenStack CI logging]
 
* [https://etherpad.openstack.org/havana-ci-logging OpenStack CI logging]
 
* [http://etherpad.openstack.org/NonInfraManagedTooling Review of non-infra-managed tooling]
 
* [http://etherpad.openstack.org/NonInfraManagedTooling Review of non-infra-managed tooling]

Revision as of 19:01, 18 April 2013

(Please add links to the Havana Design Summit etherpad documents here)

Documentation

Heat

Horizon

Keystone

Nova

Oslo

Network (formerly "Quantum")

Monday

Tuesday

Wednesday

QA

Tuesday


Wednesday

Swift

Monday

Tuesday (scheduled on-site for the unconference)

Process / Infra

Ceilometer

Wednesday

Thursday

Glance

Wednesday April 17

Cinder

Wednesday

Thursday

Marconi

Monday

Log Analysis