Difference between revisions of "Desigante/Blueprints/Rolling upgrade"
(Created page with "= Details = {| class="wikitable" |- ! Gerrit Patch || n/a |- ! Launchpad Blueprint || [https://blueprints.launchpad.net/designate/+spec/designate-rolling-upgrade] |}") |
(Rolling-upgrade) |
||
Line 6: | Line 6: | ||
! Launchpad Blueprint || [https://blueprints.launchpad.net/designate/+spec/designate-rolling-upgrade] | ! Launchpad Blueprint || [https://blueprints.launchpad.net/designate/+spec/designate-rolling-upgrade] | ||
|} | |} | ||
+ | |||
+ | |||
+ | ==Specs== | ||
+ | |||
+ | {| class="wikitable" | ||
+ | |- | ||
+ | ! Gerrit Patch || n/a | ||
+ | |- | ||
+ | ! Specs || [https://review.openstack.org/#/c/451865/] | ||
+ | |} | ||
+ | |||
+ | == Discussion== | ||
+ | The Designate need to perform upgrade from N-1 version into N version without downtime and or minimal downtime. This solution will help operator keep working for their system during they perform upgrade to new version. That is Rolling-Upgrade. I also listed out whole items what we should perform to rolling-upgrade for Designate project without downtime in the my specs. |
Latest revision as of 07:26, 3 April 2017
Details
Gerrit Patch | n/a |
---|---|
Launchpad Blueprint | [1] |
Specs
Gerrit Patch | n/a |
---|---|
Specs | [2] |
Discussion
The Designate need to perform upgrade from N-1 version into N version without downtime and or minimal downtime. This solution will help operator keep working for their system during they perform upgrade to new version. That is Rolling-Upgrade. I also listed out whole items what we should perform to rolling-upgrade for Designate project without downtime in the my specs.