Jump to: navigation, search

Difference between revisions of "CinderAntelopeMidCycleSummary"

(recordings)
(recordings)
Line 19: Line 19:
 
==Session Two: R-9: 18 January 2023==
 
==Session Two: R-9: 18 January 2023==
 
===recordings===
 
===recordings===
Recording for Midcycle 2: https://bluejeans.com/s/3cDgbhL7LLI
+
* Recording for Midcycle 2: https://bluejeans.com/s/3cDgbhL7LLI
Recording for Midcycle 2 (YouTube): https://youtu.be/ZYMgvZbi2Dc
+
* Recording for Midcycle 2 (YouTube): https://youtu.be/ZYMgvZbi2Dc
 +
<br />
  
 
We held our second mid cycle of the 2023.1 (Antelope) development Cycle on 18th January (R-9 week) between 1400-1600 UTC.
 
We held our second mid cycle of the 2023.1 (Antelope) development Cycle on 18th January (R-9 week) between 1400-1600 UTC.

Revision as of 16:04, 19 January 2023

Introduction

Welcome to the Cinder Antelope midcycle summary page!

We conduct 2 midcycles every 6 months (OpenStack release) that acts as a checkpoint for the following:

  • Revisiting/following up the topics discussed at PTG
  • Discuss topics that were missed during PTG due to author's unavailability or lack of time or any other reason
  • Status of work items based on the milestone

There could be more reasons but the above highlighted are the major ones.

For Antelope, the Midcycle will happen at:

  1. R-16: 30th November, 2022 (Wednesday) 1400-1600 UTC
  2. R-9: 18th January, 2022 (Wednesday) 1400-1600 UTC

Etherpad: https://etherpad.opendev.org/p/cinder-antelope-midcycles

Session Two: R-9: 18 January 2023

recordings


We held our second mid cycle of the 2023.1 (Antelope) development Cycle on 18th January (R-9 week) between 1400-1600 UTC.

There were a lot of topics discussed but two important cinder policies to keep in mind for active/new contributors is as follows:


Coming to the topics, following are the topics discussed and their conclusions:

  • Cinderclient to OSC migration update
    • There are few concerns regarding storyboard as the bug tracker and the review bandwidth issue that might take long time to get things merged in OSC
    • We will stop accepting new CLI changes into cinderclient from Bobcat
  • tox4 update
    • Apart from cinderlib and python-cinderclient, other cinder projects have adapted to tox4 and gate is working fine
    • for cinderlib and python-cinderclient, we will pin it to tox3 until tox4 is stable for these branches
  • python-six
    • The last cycle using python2 as a runtime is Train and we still have six compatibility code in cinder codebase
    • General consensus of team is to move forward with removing six
    • We also don't have a backport problem since the last active stable branch is Xena
    • Driver vendors are recommended to remove six code from their drivers

Session One: R-16: 30 November 2022

recordings

YouTube Recording for Midcycle 1: https://youtu.be/fKulY7whZlo

We held our first mid cycle of the 2023.1 (Antelope) development Cycle on 30th November (R-16 week) between 1400-1600 UTC.

We started out with specification status. we currently have 3 active specs:


We continued with drivers proposed/targeted for this cycle:


Other topics (following) can be found in the etherpad as well as in the recording.

  • remove Xenserver image support
  • cinderlib Recursion Error
  • Infinidat driver improvements