Difference between revisions of "Meetings/Kuryr"
< Meetings
(→Meeting January 4, 2015) |
|||
Line 8: | Line 8: | ||
Every two weeks (on odd weeks) on Tuesday at 0300 UTC in #openstack-meeting-4 (IRC) Starting: Nov. 17th, 2015 | Every two weeks (on odd weeks) on Tuesday at 0300 UTC in #openstack-meeting-4 (IRC) Starting: Nov. 17th, 2015 | ||
Every two weeks (on even weeks) on Monday at 1500 UTC in #openstack-meeting-4 (IRC) | Every two weeks (on even weeks) on Monday at 1500 UTC in #openstack-meeting-4 (IRC) | ||
+ | |||
+ | == Meeting January 11, 2015 == | ||
+ | |||
+ | === Agenda === | ||
+ | * IPAM | ||
+ | * Kubernetes Integration | ||
+ | ** https://etherpad.openstack.org/p/kuryr_k8s | ||
+ | * Testing | ||
+ | ** Fullstack tests | ||
+ | ** Rally Benchmarking | ||
+ | |||
+ | |||
+ | |||
+ | |||
== Meeting January 4, 2015 == | == Meeting January 4, 2015 == |
Revision as of 22:54, 11 January 2016
Contents
- 1 Important Links
- 2 Meeting Time
- 3 Meeting January 11, 2015
- 4 Meeting January 4, 2015
- 5 Meeting December 22, 2015
- 6 Meeting December 15, 2015
- 7 Meeting December 7 (December 8), 2015
- 8 Meeting November 30 (December 1), 2015
- 9 Meeting November 23, 2015
- 10 Meeting November 17, 2015
- 11 Previous Meeting Logs
Important Links
Meeting Time
Every two weeks (on odd weeks) on Tuesday at 0300 UTC in #openstack-meeting-4 (IRC) Starting: Nov. 17th, 2015 Every two weeks (on even weeks) on Monday at 1500 UTC in #openstack-meeting-4 (IRC)
Meeting January 11, 2015
Agenda
- IPAM
- Kubernetes Integration
- Testing
- Fullstack tests
- Rally Benchmarking
Meeting January 4, 2015
Agenda
- Kubernetes Integration
- Testing
- Fullstack tests
- Rally Benchmarking
- IPAM
- Capabilities
- Packaging (and Kolla)
- Magnum Integration
Meeting December 22, 2015
Apologies for absence
- banix, gsagie
Agenda
- IPAM
- Review vikasc patches
- OVS unbind - https://review.openstack.org/#/c/259888/ (kexiadong)
- OVS Hybrid - is this needed?
- Linux Bridge binding (banix)
- Capabilities (apuimedo)
- Testing
- Tempest fullstack job merged
- Rally integration job merged and should work - start adding plugins/scenarios
- Docker Swarm
- Works seamlessly; Will prepare a demo (banix)
- Kubernetes Integration - etherpad
- Kolla and Packaging
- Working through the issue of Kolla requiring Docker 1.8
- Magnum
- IPAM
Meeting December 15, 2015
Agenda
- IPAM
- Review patch https://review.openstack.org/#/c/256205/
- Binding
- Review patch https://review.openstack.org/#/c/254417/
- OVS unbind is missing - banix/gsagie
- OVS Hybrid and Linux Bridge
- Binding Library?
- Capabilities
- Testing
- Fullstack / Gate
- Review - https://review.openstack.org/#/c/255851/
- Review - https://review.openstack.org/#/c/255797/
- Review - https://review.openstack.org/#/c/255754/
- Unit and Functional testing
- Rally Integration - in Rally tree or in Kuryr repository
- Fullstack / Gate
- Docker Swarm Working?
- Packaging
- Kolla Integration and Containerised containers
- Magnum + Nested Containers Integration/Design
- Open Discussion
- IPAM
Meeting December 7 (December 8), 2015
Apologies for absence
- banix can attend only the first 10-15 minutes
Agenda
- Topics to Discuss
- IPAM
- Patch for review https://review.openstack.org/#/c/252848/
- Patch for review https://review.openstack.org/#/c/252835/
- Patch for review https://review.openstack.org/#/c/248042/
- IPAM
- Reuse Existing Networks
- Spec for review https://review.openstack.org/#/c/254005/
- Reuse Existing Networks
- Binding
- Patch for review https://review.openstack.org/#/c/253285/
- Binding
- Capabilities
- Testing
- Open Discussion
Meeting November 30 (December 1), 2015
Agenda
- General Action Items (from last week meeting)
- apuimedo add docker network creation commands to devref
- banix to finish implementation of https://blueprints.launchpad.net/kuryr/+spec/kuryr-config
- banix will work on completing this work item this week: https://review.openstack.org/#/c/251532/
- check with kuba for an estimation on when we'll have conntrack in master
- irenab, tfukushima and banix to review https://review.openstack.org/#/c/241134/ and either make it change to disabled-not-configurable or approve
- Done
- Binding (Plug/Inplug)
- diga to submit the ovs binding patch by ~ 2015-11-24
- Since no progress has been made and this work item is blocking other efforts, banix will upload a patch shortly
- irenab to check re-usability of https://github.com/openstack/os-vif https://review.openstack.org/#/c/193668/5/specs/mitaka/approved/os-vif-library.rst
- diga to submit the ovs binding patch by ~ 2015-11-24
- Devstack
- get devstack plugin merged and finished this week
- apuimedo to make devstack nova inclusion configurable in the sample local.conf
- IPAM
- vikas tfukushima to work on the ipam as a spec or new bp
- External Network Connectivity
- vikas to move external connectivity to spec with the assumption of no default action
Meeting November 23, 2015
Agenda
- Action Items (from last week meeting)
- fawadkhaliq to check on plan for conntrack OVS support in Mitaka
- banix to get the plug/unplug for OVS ready for review
- All to review external connectivity blueprint #link
https://blueprints.launchpad.net/kuryr/+spec/external-network-connectivity
- vif plug()/unplug()
- Make the call of existing plan of action as the https://github.com/openstack/os-vif is pretty much empty
- IPAM driver devref: https://review.openstack.org/#/c/248010/
- devstack integration follow up
Meeting November 17, 2015
Agenda
- Announcements
- Starting to have alternate meeting time: https://review.openstack.org/#/c/245868/
- Action Items (from last week meeting)
- gsagie to check conntrack for security groups in the mitaka cycle
- banix to work with diga on the ovs binding (with the hybrid as follow up patches if necessary)
- apuimedo to review validation vikasc patches
- apuimedo to review the external network connectivity blueprint
- vif plug()/unplug()
- The repository for the vid library has been created: https://github.com/openstack/os-vif
- IPAM driver
- devstack integration
Meeting August 24, 2015
- Action Items from last week meeting
- diga to update on the executable calling via gerrit ;-). There are some reviews that need to be addressed.
- tfukushima to find out about the label persistence or libnetwork abuse, i.e. Persistence of network creation labels to be able to use it for persisting the mapping of Docker networks to pre-existing Neutron networks.
- gsagie to look at putting the network resource info in neutron as a last resort option
- banix to update on configuration management for the next meeting
- irenab gsagie to propose dates and format for the Sprint.
- Go over the magnum-etherpad to review what changed since Thursday
Meeting August 17, 2015
Agenda
- vif-binding-unbinding
- libnetwork <-> docker network mapping
- feature mapping
- configuration management
- sprint proposal
- VM container networking
Meeting August 10, 2015
Agenda
- Action Items from last week meeting:
- apuimedo to submit a draft proposal for vif-binding-unbinding
- apuimedo to put in the next week's agenda configuration management
- banix to set up a draft spec for configuration management
- apuimedo to add the topic to the next meeting agenda
- apuimedo to find takers for the kolla blueprint
- banix to look at Kolla and draft a spec for Kuryr inclusion
- Magnum and how it relates to Kuryr
Meeting August 3, 2015
Agenda
- Review the project goals
- Magnum / Kolla
- Reviews
Previous Meeting Logs
- Available here: Kuryr Meeting Logs