* Announcements
 
* Announcements
** OpenInfra Foundation Individual Board member election is happening now. Look for your ballot via email and vote.
+
** OpenInfra Summit CFP ends May 29, 2024
** OpenInfra Live will feature OpenDev January 18, 2023.
 
  
 
* Actions from last meeting
 
* Actions from last meeting
Line 18: Line 17:
  
 
* Topics
 
* Topics
** Upgrading Bionic servers to Focal/Jammy (clarkb 20230627)
+
** Upgrading Old Servers (clarkb 20230627)
 
*** https://etherpad.opendev.org/p/opendev-bionic-server-upgrades
 
*** https://etherpad.opendev.org/p/opendev-bionic-server-upgrades
** Python container updates (tonyb 20230718)
+
*** https://etherpad.opendev.org/p/opendev-focal-server-upgrades
*** https://review.opendev.org/c/opendev/system-config/+/905018 Drop Bullseye python3.11 images
+
*** Started looking at the wiki there are rough notes at: https://etherpad.opendev.org/p/opendev-bionic-server-upgrades#L58
*** zuul-operator is the last hold out now
+
*** Tonyb looking at cacti and the wiki as next items.
**** https://review.opendev.org/c/zuul/zuul-operator/+/881245 is the change we need to get landed.
+
** AFS Mirror cleanups (clarkb 20240220)
** Updating Zuul's database server (clarkb 20231121)
+
*** Ubuntu Xenial cleanups are starting to show up under topic:drop-ubuntu-xenial
*** Currently this is an older mysql 5.7 trove instance
+
*** Can followup with webserver log processing to determine which other mirrors may be dead.
*** We can move it to a self hosted instance (maybe on a dedicated host?) running out of docker like many of our other services and get it more up to date.
+
** Gerrit 3.9 Upgrade Planning (clarkb 20240423)
*** Are there other services we should consider this for as well?
+
*** Upgrade prep notes are going in https://etherpad.opendev.org/p/gerrit-upgrade-3.9
*** Research/Planning questions: https://etherpad.opendev.org/p/opendev-zuul-mysql-upgrade
+
*** https://www.gerritcodereview.com/3.9.html Release Notes
** EMS discontinuing legacy/consumer hosting plans (fungi 20231219)
+
*** Planning to upgrade the Gerrit server on May 31, 2024 from 1600-1700 UTC
*** We have until 2024-02-07 to upgrade to a business hosting plan (prepaying a year at 10x the current price) or move elsewhere.
+
*** infra-root please take a minute to look over the upgrade document and call out any concerns before we get too close to the upgrade date.
** Followup on 20231216 incident (frickler 20231217)
+
** Linaro Cloud SSL Cert Renewal (clarkb 20240521)
*** Do we want to pin external images like haproxy and only bump them after testing? (Not sure that would've helped for the current issue though)
+
*** It has been a couple of months and we need to renew the cert again. Should be documented now. Any volunteers?
*** Use docker prune less aggressively for easier rollback?
+
** Gitea 1.22 Upgrade Planning (clarkb 20240528)
**** We do so for some services, like https://opendev.org/opendev/system-config/src/branch/master/playbooks/roles/gitea/tasks/main.yaml#L71-L76, might want to duplicate for all containers? Bump the hold time to 7d?
+
*** There is a Gitea 1.22.0 release now. Once we have the general upgrade working we can test the doctor tool to fixup the DB case sensitivity.
*** Add timestamps to zuul_reboot.log?
+
*** https://review.opendev.org/c/opendev/system-config/+/920580
**** https://opendev.org/opendev/system-config/src/branch/master/playbooks/service-bridge.yaml#L41-L55
 
**** Also this is running on Saturdays (weekday: 6), do we want to fix the comment or the dow?
 
*** Do we want to document or implement a procedure for rolling back zuul upgrades? Or do we assume that issues can always be fixed in a forward going way?
 
** AFS quota issues (frickler 20231217)
 
*** mirror.openeuler has reached its quota limit and the mirror job seems to be failing since two weeks. I'm also a bit worried that they seem do have doubled their volume over the last 12 months
 
*** ubuntu mirrors are also getting close, but we might have another couple of months time there
 
*** mirror.centos-stream seems to have a steep increase in the last two months and might also run into quota limits soon
 
*** project.zuul with the latest releases is getting close to its tight limit of 1GB (sic), I suggest to simply double that
 
** Broken wheel build issues (frickler 20231217)
 
*** wheel builds for centos >=8 seem broken, with nobody maintaining these it might be better to drop them?
 
** Gitea repo-archives filling server disk (clarkb 20240109)
 
*** https://review.opendev.org/c/opendev/system-config/+/904868 update robots.txt on upstream's suggestion
 
*** https://review.opendev.org/c/opendev/system-config/+/904874 Run weekly removal of all cached repo archives
 
** OpenDev Service Coordinator Election happening soon  (clarkb 20240109)
 
  
 
* Open discussion
 
* Open discussion
Line 57: Line 42:
 
Changes should have their topic set to project-rename.
 
Changes should have their topic set to project-rename.
  
* Rename foo/example -> bar/example: https://review.opendev.org/123456
+
* Rename example/foo -> example/bar: https://review.opendev.org/c/openstack/project-config/+/123456
  
 
== Previous meetings ==
 
== Previous meetings ==
 
Previous meetings, with their notes and logs, can be found at http://eavesdrop.openstack.org/meetings/infra/ and earlier at http://eavesdrop.openstack.org/meetings/ci/
 
Previous meetings, with their notes and logs, can be found at http://eavesdrop.openstack.org/meetings/infra/ and earlier at http://eavesdrop.openstack.org/meetings/ci/

Latest revision as of 17:39, 27 May 2024

Weekly Project Infrastructure team meeting

The OpenDev Team holds public weekly meetings in #opendev-meeting on OFTC, Tuesdays at 1900 UTC. Everyone interested in infrastructure and process surrounding automated testing and deployment is encouraged to attend.

Please feel free to add agenda items (and your IRC nick in parenthesis).

Agenda for next meeting

  • Announcements
    • OpenInfra Summit CFP ends May 29, 2024
  • Actions from last meeting
  • Specs Review
  • Open discussion

Upcoming Project Renames

(any additions should mention original->new full names and link to the corresponding project-config rename change in Gerrit) Changes should have their topic set to project-rename.

Previous meetings

Previous meetings, with their notes and logs, can be found at http://eavesdrop.openstack.org/meetings/infra/ and earlier at http://eavesdrop.openstack.org/meetings/ci/